In-depth analysis of common issues that program/project managers often face in organisations that lack a culture that supports implementation of project management methodologies.

Purpose of the assessment:

Project management problems can occur when project management methodologies are not implemented successfully across organisations. In this assessment task, you are required to write a report on the current project management issues in the following case-study, in 800 to 1000 words exclusive of references.

RAPID PROTOTYPING - NEW DISCIPLINE

Rapid prototyping has been a constant growing and evolving field since the late 1980s. As technology improved, so did the opportunities in new markets. The idea quickly evolved from its grassroots beginning to many small companies competing for a bigger share of the growing market.

Frank Billings was just another name in what was at that time a niche market. As a student in engineering school, he followed the development of the new prototyping techniques and realized their potential in the marketplace. His dream job was to work for a rapid prototype equipment manufacturer. There were only a few start - up companies in rapid prototype machine development, however, and none could pay the average engineer wage.

Like most engineering school graduates overloaded with school loans, he couldn't wait for his dream job to come along, so he went for a job at Cocable Company. Cocable designed and manufactured specialty cable and cable - related products. It had nothing to do with rapid prototyping, but it paid well. He worked hard at Cocable and earned enough to pay down his debts. He proved to be an excellent engineer, earning a great reputation at Cocable and making many contacts along the way. In those three years at Cocable, however, he never stopped thinking about rapid prototype machines. He spent his free time coming up with a rapid prototype machine design, always dreaming of having his own company. Three years in, he was ready. He quit Cocable and started his own rapid prototype (RP) design business. He perfected his own RP machine design and was ready to prove himself in the growing field.

BUSINESS BOOMS

Like every start - up business in a new field, finding customers is tough. In the RP field, there are two types of work. The first includes owning an RP machine and doing prototypes per order. The second is selling RP machines to businesses that want the machine to do in - house RP. The latter option is far more profitable since the machines are more expensive than each prototype they produce. Frank would have been happy with either type of business, since at the time, he wasn't doing much business at all.

All those years making contacts at Cocable Company proved to be worth the time and effort. He had stayed in touch with these contacts and through them was happy to learn that Cocable had just been hired by GE to design and manufacture cable installations on their newest jet engine. Part of the wiring installation that Cocable had been hired to design included junction boxes and switch covers. The installation would be no simple task as these " boxes " are made of specialty materials with complex shapes and multiple designs, all needed for application. They had to be perfect from the start since airplane engines have no room for error. This was a huge job and the timeline was tight. Rapid prototypes were an absolute necessity for this job. Frank's knowledge of Cocable's needs made him perfect for the RP job.

Cocable wanted full access to rapid prototyping so they decided to contract Frank to custom build four RP machines to their specifications. Frank could not be happier. The RP machine specs were given to Frank and he went to work.

WHO IS GOING TO PAY FOR THE CHANGES?

After three months of all - night work sessions, the machines were built to specification and ready for delivery to Cocable. Frank ' s daring steps into a new field were fully rewarded, he thought.
Everyone was ready for a test run, after the first machine was delivered to Cocable. The CAD model was loaded and it was time to hit the "Start" button.

Beep, beep, beep.

"That's not good, " said Frank.

He felt embarrassed that the machine failed in front of everyone. He was sure the machine ran fine before it was delivered. He couldn't allow his first major deal to fail in any way. The machine was checked over for shipping damages. The connections were double - checked. Everything appeared intact. Frank sat down to review the CAD model and discovered the problem. The model was 62 inches long. This was an issue, considering the RP machines were designed for a maximum of 55 inches.

The original Cocable specs for Frank's RP machines were for a maximum length of 48 inches. Frank optimized his machines for a length of 48 inches, but to be on the safe side, the machines were capable of 55 - inch designs. Sixty - two inches went outside that range. A machine that could make prototypes that long would require completely different processors, actuators, and adhesion processes. This would be a major redesign of the RP machines. This would take time and a lot of money.

Cocable claims that the original specs for a maximum of 48 inches came from GE. GE claims that it never gave Cocable a maximum length. The first design that GE requested from Cocable was 62 inches long and that had been weeks before. Cocable should have double - checked their RP specs. Nobody wants to take the blame for specifying the prototype design sizes and Frank's first major product is now going nowhere. Everyone is dissatisfied and two things are for sure: (1) The entire project is running late, and (2) it will be way over budget.

You are a Project Management consultant, and have been commissioned to write a report on this case. Write the report to address the following questions.

Questions to be addresses in the report:

1. What lessons can be learnt from this case?

2. Who do you think should pay for the changes?

3. What could have been done to make sure that the project scope was correct?

Computer Network & Security, Computer Science

  • Category:- Computer Network & Security
  • Reference No.:- M92420128
  • Price:- $25

Priced at Now at $25, Verified Solution

Have any Question?


Related Questions in Computer Network & Security

Final project incident response exercise amp reportyour

Final Project: Incident Response Exercise & Report Your Task You have been assigned to work incident clean-up as part of the Sifers-Grayson Blue Team. Your task is to assist in analyzing and documenting the incident desc ...

Topic is impacts of data breaches the report will divide in

Topic is "Impacts of data breaches". the report will divide in to 5 section which is : "" 1-Abstract: comprehensive overview of the report in 150 to 200 words. 2- Introduction: Describe the topic and its issue in 250 to ...

Question suppose public-key cryptography is used to encrypt

Question : Suppose public-key cryptography is used to encrypt the communications between Alice and Bob. Alice's public key is eA, private key is dA; Bob's public key is private key is de. Now Bob wants to send a message ...

Assignment descriptionproject scope a typical

Assignment Description Project Scope: A typical network layout diagram of a firm is given below for illustrative purposes only. The service requirements are enclosed. Figure. Network layout of a firm Service requirements ...

Data model development and implementationpurpose of the

Data model development and implementation Purpose of the assessment The purpose of this assignment is to develop data models and map Database System into a standard development environment to gain understanding of data m ...

Question calculate the total time required to transfer a

Question: Calculate the total time required to transfer a 1.5-MB file in the following cases, assuming an RTT of 80 ms, a packet size of 1 KB data, and an initial 2 × RTT of "handshaking" before data is sent: (a) The ban ...

Assignment -need project made by packet truce follow the

Assignment - Need project made by packet Truce. Follow the given report and please don't make the project big and video will describe full project in details and with configuration. Project - Design and Implementation of ...

Assignment descriptionproject scope a typical network

Assignment Description Project Scope: A typical network layout diagram of a firm is given below for illustrative purposes only. The service requirements are enclosed. Figure. Network layout of a firm Service requirements ...

Advanced network design assessment - human factors in

Advanced Network Design Assessment - Human factors in network analysis and design Purpose of the assessment - This assignment is designed to assess students' knowledge and skills related to the following learning outcome ...

If a firms total cost function is given byt c

If a firm's total cost function is given byT C= 115,000Q-500Q2+Q3, what range of output does the firm have economies of scale?

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As