Your contracting company has just been awarded a large earthmoving contract that would be well suited for a Caterpillar 950H loader to load trucks with. A local rental yard said that they will supply you the loader for $50.00 per hour plus $4.15 sales tax not including any operating costs. You need to analyze what it would cost your company to purchase the loader instead of renting it. The purchase price including sales tax and attachments is $260,000. The project will last 5 years and you are not sure that you will have work for the loader after this project therefore you need to plan on selling it at the end of 5 years for 60% of the original purchase price. According to the schedules that the project managers have put together it appears that you will be able to get 1,500 hours of utilization per year on the loader during all five years and they also anticipate 45 minute efficiency working hours. According to the Chief Financial Officer of the company your cost of money is 8% and the insurance on the loader will be .4% of the value. Your tire sales person says that a set of 4 tires will cost $9,000.00, last 2,500 hours and the average repairs will be about 14% of the purchase price over the life of the tires. The preventative maintenance schedule that your fleet is on has PM1 oil changes completed every 225 hours with oil, lube and filter cost at $8.00 per gallon, the repair and maintenance cost is $3.00 per hour and your throttle load factor for the loader is 65%. The loader will be scraping the ground about 30% of the time with high wear ground engaging cutting edges that cost $400.00 per set and will last 200 hours performing this application before they wear out. Diesel fuel is $3.00 per gallon.

a. What is the ownership cost per hour?

b. What is the operating cost per hour?

c. What does it cost to use the rental machine per hour?

d. Over 5 years at 1,500 hours per year what is the total cost difference?

e. What is one unique fact that you learned about the 950 loader?

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9898413

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As