Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Civil

You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Alexandra Road, Essendon. As the cost planner on the project (clients Cost Planner), you have produced a pre-tender estimate (in the form of priced bill of quantities - attached). Conduct a tender assessment/evaluation of the commercial aspect of the 3 tenders received (scrutinize the tenders for completeness and accuracy of the commercial offer, reasonableness of prices and unit rates as well as incidences of front-loading). Prepare an interim tender report. Disregard the technical aspect of the tenders.

Manufacturing

Your tasked to create a pre-tender estimate of the cost to produce and deliver the ‘LTU Swiper'. A diagram is shown in the appendix. The LTU Swiper is a handy household item for cleaning windows. The part is to be made using plastic injection moulding using a technique known as 2K. 2K moulding enables the use of more than one plastic to be injected into the same mould. In this particular the case the LTU Swiper handle is to be made from Polypropleyene (PP) and the Blade from Ethylene Propylene Diene Monomer (EPDM). The intended market for this product is the Asia-pacific market with a distribution centre located in Bundoora, Australia. Quantities may vary dependent on market demand. Initial estimates are that this will be a 100,000 units. The time for delivery is 45 days from order placement. You are provided with bill of quantities prepared separately, priced and submitted by 3 different producers located locally in Australia, and overseas in New Zealand and China.

Report structure

The tender report should include the following,

1. Executive Summary

2. Project Introduction/assumptions

3. Tender process description

4. Each tenderer's review and discussion

5. Conclusion

6. Appendix

Make reasonable assumptions where necessary for the assignment.

Attachment:- Civl_estimates.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M93137301
  • Price:- $12

Guranteed 24 Hours Delivery, In Price:- $12

Have any Question?


Related Questions in Civil Engineering

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As