You are an engineer working for a utility company. Your project team is designing the power distribution (overhead wires) in a new subdivision. Shown in the following is the last pole along one of the streets. For this dead end configuration you have the following specifications:

Electric Pole:

Class 2, 100 feet long, with 10 feet buried in earth. Maximum axial load given in column load table.

Stub Pole:

Class 2, 50 feet long, with 10 feet is buried in earth. Maximum axial load given in column load table.

Anchor:

14” PISA with a maximum permitted pull-out load of 17,500 pounds.

Guys:

11k guys that have a maximum permitted tension load of 11,300 pounds.

Wires:

Three primary wires (A, B, and C) – 123.33 AAAC. Each is subject to 2140 pound tension (hence the name ‘high tension wire’).

Neutral - #3 Copper. subject to 1180 pounds tension

Finally, you have been instructed to use Class C construction standards. This means a safety factor of 1.1 must be used in your analysis.

The electric pole and the stub pole are at the edges of the roadway right-of-way. The anchor will be outside of the right-of-way and will require the subdivision to purchase land from the neighbouring farmer (who is VERY UNHAPPY about the subdivision in the first place.) Thus, your project leader, knowing that you are an expert in statics, has assigned you the task of determining the minimum guy lead length (to the nearest foot) for this pole configuration.

TABLE OF COLUMN LOADING LIMITS

50 FOOT UTILITY POLE

(Values based on distance from the top of the pole)

DISTANCE (ft.) MAXIMUM LOAD (lbs.)

1.0 12,600

1.5 13,325

2.0 14,050

2.5 14,775

3.0 15,500

3.5 16,150

4.0 16,800

4.5 17,450

5.0 18,100

5.5 19,175

6.0 20,250

6.5 21,325

7.0 22,400

7.5 23,750

8.0 25,100

8.5 26,450

9.0 27,800

9.5 29,225

10.0 30,650

10.5 32,075

11.0 33,500

11.5 35,625

12.0 37,750

12.5 39,875

13.0 42,000

13.5 44,125

14.0 46,250

14.5 48,375

15.0 50,500

15.5 53,975

16.0 57,450

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91099595

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As