You are a mine planning engineer at a medium sized operation producing 1.5 mtpa of coper ore at 3% Cu. The mine was originally designed as an open cut using a bench height of 15m. Footwall benches were 15 m wide to give a slope angle of 45°, but on the hanging wall side alternate benches are only 10m wide to produce an angle of about 50°.

Underground mining was commenced using a footwall decline from the 15m bench to access 2 lifts of open stoping down to the -210m level. The first lift of stopes are completely mined out, an extraction of the second lift is 50% complete. A 6m diameter shaft has been sunk to a depth of 700m from a collar at +55m for the long term. Mining below the -210m level is to be by sub-level caving. A transport level is to be developed at the -510 level to transport all ore from levels above via ore passes to a crushing station at the -610m level and then to a loading station at the -630m level.

You are required to design a drainage and pumping system to deal with the mine water for the next 10-15 years based on the data in the following sections. As the mine grade is low and power costs are high every effort should be made to minimise the operating costs of the pumping system. Describe your proposed drainage and pumping system with the aid of diagrams where required and explain the general philosophy behind the system. Detail and assumptions made and make comments and conclusions as required.

Data

Development gradients

Decline to -210m

Decline below -210m

Drill levels 1 and 3

Extraction levels 2 and 4 Future sub levels

Main haulage level -590 m

Mine water

1 in 9 , curves 1 in 15 1 in 7 , curves 1 in 12 1 in 50 down

1 in 50 up

1 in 50 up

1 in 200 up

 

 

 

Ground water: currently averages 1,000,000 litres/day and is expected to increase at a rate of 10% per year as the mine deepens. Flows are higher in winter up to double the average for 3-4 months. The main source is the fissured footwall rock.

Mine water: averages 70,000 I/day with large variations in use on an hour by hour basis. When sub level caving commences the usage is likely to double but usage is also expected to be more uniform.

Surface runoff: Currently this is contained in the open cut and is pumped from a sump in the pit bottom. Once crown pillars are blasted and caving is initiated this surface water will find its way into the cave and eventually into the mine. Any future estimates need to be based on expanding the catchment area and on the following rainfall data.

Rainfall: the average annual rainfall s 740 mm, the average monthly figures are as follows

January                                                         10mm

February                                                        10mm

March                                                            40mm

April                                                              60mm

May                                                              80mm

June                                                              100mm

July                                                               110mm

August                                                          120mm

September                                                     90mm

October                                                         60mm

November                                                      40mm

December                                                      20mm

Based on measurements in the locality the maximum rainfall intensity recorded over the last 50 years is as indicated below and needs to be accounted for:

Storm duration (hours)

Intensity (mm/hr)

2

40

4

25

8

15

12

12

16

10

20

9

24

8

36

6

48

5

Water Quality: Run of mine water is expected to be slightly acidic due to the formation of sulphuric acid from sulphides within the rock. Likely pH is in the range 5.5-6.5.

Cave angles: Expected cave angles are 60° in both footwall and hanging wall and 75°at ends of the ore body

Rock properties: SG of 2.7 for all rocks. Hanging wall and ore have moderate strength, footwall is very strong.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91592779
  • Price:- $200

Guranteed 48 Hours Delivery, In Price:- $200

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As