Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Water resource engineering

Question 1. Prepare a table of plotting points for IDF curve for 2, 5, 10, 15 and 20 -year for the rainfall record shown in the table below. Show all the calculations and draw the curves in an Excel sheet.

Rainfall record (1 Jan. 1960 - 31 Dec. 2007)

Number of storms intensity or more

Duration (mm)

Intensity (mm/h)

20

30

40

60

80

100

120

140

160

180

200

5






252

56

18

8

5

3

10





265

71

21

9

5

2


15




248

99

22

8

4

2



20


255

92

37

12

6

4

2




30

211

49

19

10

3

3

1





40

78

33

9

2








50

33

13

3









60

9

2

 

 

 

 

 

 

 

 

 

Question 2. Melbourne polytechnic has proposed that a baseball park to be built in its Epping campus. A site on a 12-ha pasture has been selected. Drainage from the site passes through a culvert under existing road. The capacity of culvert is not known. The university highway department uses a 5-year return period for design of culverts for this type of road. From the topographic data of the site, the overland flow estimated to be 2.00 percent, and the runoff coefficient is estimated to be 0.20. Using the IDF curves Melbourne, estimate the peak flow capacity of the existing culvert in m3/s.

Question 3. The proposed parking lot for the baseball park (Problem 2) will occupy 2.55 ha of the site. It will be graded to a slope of 1.80 percent. The overland flow distance will be 200.0 m and the runoff coefficient is estimated to be 0.70. Ignoring the runoff from the pasture, determine whether the existing culvert has the capacity to carry the peak flow from the parking lot from a storm with a 5-year return period. Use the IDF for Melbourne.

Question 4. Determine the unit hydrograph ordinates for the Convex River flow data shown below. For ease of computation the total ordinates are tabulated below the hydrograph. Note that the base flow may be determined by simple graphical extrapolation. The area of the watershed is 100ha. Note that the time is military time, that is, 1500h = 3 PM, 2000h = 8PM etc.

1369_Fig.jpg

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91962401
  • Price:- $95

Guranteed 48 Hours Delivery, In Price:- $95

Have any Question? 


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As