Two equations govern the flow of runoff on a slope. The first is the continuity equation (conservation of mass) and the second is an equation describing conservation of momentum. The continuity equation is just the water balance for the slope or any small portion of the slope and can be given as: p - fp = RO where i = rainfall rate, fp = infiltration capacity, and RO = runoff rate, all expressed as a depth per time, e.g. mm h-1 . Since Q= VA, the Q for each unit width = i*1*depth*length of slope. The momentum, or flow equation we often use is Manning's equation: V = 1.49 R2/3 S0.5.n

Application:

You have been asked to determine the rate and depth of flow from a parking lot at a shopping mall and recommend the size of the gutter needed to accommodate the runoff from the lot. The lot is 300 feet by 500 feet. The overland flow portion is the 300 feet and has a slope of 2.0%. Flow will enter the gutter along the 500 feet at the bottom of the overland flow. The gutter has a slope of 1.0 % and a rectangular cross section with a bottom width of 1.5 foot.

Determine the following:

1. The discharge, q, along the 300 feet of overland flow,

2. The depth, d, of flow along the 300 feet of overland flow, and

3. The discharge, Q, and depth of flow in the gutter.

Someone spills a container of gasoline at the farthest corner of the parking lot during the storm. Estimate the average time for the gasoline to reach the outlet of the gutter.

Procedure:

1. Use a 1/2-hour duration, 10-year recurrence interval storm for the exercise. Assume that the rainfall occurs at a uniform intensity during the 1 hour duration. You can use the IDF (Intensity-Duration-Frequency) curves for Region 2 in Precipitation in Connecticut available at www.ctiwr.uconn.edu under Publications/special reports. or http://digitalcommons.uconn.edu/ctiwr_specreports/36/ for the direct link.

2. Determine the discharge along the slope of the lot in cfs per foot of width across the lot for every 10 foot increment. Using Manning's equation, determine the depth of flow down the lot, i.e. from the top to the entrance to the gutter, again at 10 ft increments. The surface of the lot is older, rough asphalt which has an 'n' value = 0.10 for shallow flow. NOTE: this ‘n’ maybe higher than typically given, but we assume at first that the flow is very shallow.

3. Determine the discharge along the gutter and calculate the depth needed for the gutter at its outlet. The gutter is made from concrete which has an 'n' value = 0.04.

4. In the design of storm water control systems, engineers often will add "freeboard" to the calculated depth of a channel to account for blockage, changes in 'n', etc. Determine if 0.5 feet of added depth to the gutter will accommodate the 100-year, 1/2-hour storm.

5. Using the velocities calculated from Manning's, determine the time it takes for the gasoline to reach the outlet of the gutter. State any assumptions involved in your calculations.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91097504

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As