Schedule of works for the refurbishment of university campus

A schedule explains the method and procedure by which the works will be carried out using NBS - National Building Specification

A FILE WILL BE UPLOAD TO SHOW THE EXISTING FLOOR PLAN AND THE NEW FLOOR PLAN ( TO SHOW THE WORKS THAT WILL NEED TO BE CARIRIED OUT)

Works that need to done.

1. relocating the mens toilets from one location to another, (reusing the same materials)

2. installing a new ventilation system

3. the removal of the second entrance door and the installing of the glass automatic door at the entrance,

4. the installation of the reception desk with shutters.

5. remove of the small room with the office space.

6. Repainting all the walls (colour to be approved by client)

7. Replacing to 2 internal doors

What needs to be included?

Materials
• Type
• Colour
• Size
• Specific supplier or brand

Method
• Finish required
• Access (scaffolding or ladder?)
• Safety requirements

For each element you need to think about
• How will it be carried out
• What materials are used
• The location of the material or process
• Quantities
• Quality
• Standards
• Building regulations

Example of format.
1. Set up site facilities and erect appropriate scaffolding to BS EN 12811-1:2003
2. Remove existing slates/ridge tiles and salvage useable whole slates/ridge tiles for reuse. Safely stack on scaffold
ensuring adequate brick guards are in place. F

3. it new plywood sub facia using 18mm WBP hardwood ply using 60mm passivated screws

4. Fit new uPVC 200mm x 20mm facia (colour to be approved by client) with 50mm polytop stainless steel annular ring nails (colour to match facia)

5. Fit new uPVC 10mm ventilated soffit with 40mm polytop stainless steel annular ring nails (colour to match facia)

6. Fit new black plastic from Polypipe® Elegence® range - to include all rainwater fixtures and fittings (gutters, downpipes, brackets etc)

7. Fit new black plastic eaves support trays to provide underfelt support . Ensure minimum 50mm lap into gutter

No# of Pages:4 pages (1,000 words)

Paper Style:Harvard

No# of Sources Required:4

Attachment:- joineddocument.pdf

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91708415
  • Price:- $50

Guranteed 36 Hours Delivery, In Price:- $50

Have any Question?


Related Questions in Civil Engineering

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As