Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Topic is ballast and sub-ballast.

OBJECTIVE:

The aim of this module is to develop practical and analytical understanding of the complex and multi-disciplinary nature of railways, and to provide students with an understanding of the economics of designing, building, maintaining and renewing them. It covers the theory and practice of permanent way design for railways, and includes the interfaces with other disciplines. Students will apply their learning to design work.

OUTCOMES:

1. Employ methods of analysis for railway economics.

2. Apply understanding of the key issues in operations and safety.

3. Evaluate the principles of maintenance and performance.

4. Calculate and tabulate data for plain line design.

5. Apply industry standards in gauging and clearances design, including use of software, and demonstrate understanding of situations in which standards are not appropriate.

6. Demonstrate understanding of the contents and use of industry manuals of trackbed and drainage design.

Task 1:

Suppose that you are technical engineer in a railway company (trading, manufacturer, Vendor). You may be the owner of factory that has product line of one of railway track components such as fastening systems, Rail Joints, Sleeper (wooden, concrete, Steel, composite), welding system, machineries, .etc. In addition, you may have quarries for ballast and sub-ballast aggregates (formation layer) to produce suitable ballast aggregate for railway track.

For selling your products if you want to demonstrate and identify your productions or supply and provide the components, the client/buyer ask you to prepare a technical report involving all technical aspects to illustrate the capabilities and usage. So, Students are requested to prepare a technical report including:

- Product Description
- Design steps
- Technical specification
- Using and installing method
- Machinery with is needed to implement.
- Operation and Maintenance aspects
- Product illustration with sufficient and adequate pictures
- Cost of your products
- Condition and place of using (weather, max/min temperature, working restrictions)
- Other related things.

For doing the project, you can select one of the track component arbitrarily and choose one company (real or virtual) through the world to use its technical data and information.

Please note that proper referencing and paraphrasing must be carried out when using a document as a reference for your work. It is necessary to cover most of feasible and probabilistic technical questions from client/buyer side in your report clearly.

In the end (conclusion part), make tabular information as far as possible in a glance for your mentioned production.

Report Sections

The report should contain the following sections:
- Introduction
- Main body
- Conclusions
- References and contacts

1. Introduction
- What is your products?
- Company history and information, establishing, capability, capacity,...
- Give the general plan of the report

2. Main body
- Discuss the properties of products,
- Answer to the mentioned items above.
- Get the results and analysis if any.
- Headings should be informative and descriptive providing a clue to the contents of the section.
- Use suitable and accurate references for each paragraph that you take from others
- Each picture should have capture and a reference(s)

3. Conclusions
- Synopsis
- State briefly, what the major specification are and provide tabular data.

4. References
List alphabetically your references which should include: Journal papers, proceedings, books, book chapters, internet sources etc.
Students must refer to Student Handbook for refereeing method preferred in Middle East College.

5. Appendix
Any additional figures, tables, and photos.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91765069
  • Price:- $180

Priced at Now at $180, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As