This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County).  Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girders on brackets (which are attached to columns).  Secondary members are in the form of pre-fabricated T-section joists.   A shear wall system is considered for the wind load effects (note: because of the shear walls, your design will be only for DL and LL). 

 As a minimum, the following tasks are required:

1.      Develop a schematic design for the facility.  Include the locations of columns and show girders with a few cross sections (that will also show single footings for columns).

2.      Conduct a preliminary design and identify all loads (DL and LL).  Decide on the type of materials to be used.

3.      Design a typical girder.

4.      Design a typical column.

5.      Design a typical bracket.

6.      Design a typical footing

7.      Prepare detail drawings for the beam, column and footing you designed. 

Bonus points:  Additional points will be given for the design of the T-section joists and design of a typical foundation. 

Your calculation sheets must be clear and written on suggested calculation sheets.  Include a section in your report (up-front) for the specifications summarizing material properties, pertinent codes and specifications, assumptions made, etc.  Also include a critique, at the end of your report, summarizing what you found as areas that perhaps more work would have been needed and/or design should have been done differently. 

Grading will be based on:

1.      Completeness of the tasks requested.

2.      Correctness of calculations.

3.      Reasonableness of your design.

4.      Presentation of your project (as your final report).

 

5.      Professionalism in preparing your calculation sheets and drawings.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91420780
  • Price:- $70

Priced at Now at $70, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As