This problem concerns a traffic light placed on a stretch of road where there is no cross traffic, but where pedestrians often cross. There are two sets of lights, one facing each direction of traffic, and two pedestrian buttons, one on each side of the road. Pushing either button while the light is green causes the light to turn yellow for 10 seconds, then red for 120 seconds, and back to green. Pushing buttons while the light is yellow or while the light has been red for 10 seconds or less has no effect. Pushing a button while the light has less than 10 seconds to go before it turns green will cause the light to stay red for at least 10 seconds more than it would otherwise. We want to design a sequential circuit for the traffic light controller.

A. Show a state-transition diagram and a state-transition table for the traffic light. Let the input be the state of the buttons (1 if either button has been pushed, 0 otherwise), and assume that a clock pulse occurs once every 10 seconds. (In other words, no state transition can occur except at 10-second intervals; every 10 seconds, the input is examined and a state transition, if called for, is made.)

B. How many D flip-flops will you need to represent the states you have defined? Indicate the correspondence you have made between states in your answer to part A and the states of your set of D flip-flops. Show truth tables and Boolean equations describing the next state of each flip-flop, based on the current state of the circuit and any other appropriate inputs.

C. Draw the circuit. Assume that two input lines are available: a clock line, which gives a short pulse once every 10 seconds, and a button line, which is high if a button is pushed. Your circuit should have three output lines controlling the lights; label the lines "red," "yellow," and "green."

D. It would be nice if the pedestrian did not have to lean on the button until a transition occurred. Your circuit currently has this property, unless you have departed from the clocked sequential-machine synthesis procedure suggested in the previous steps and described in the text. Give a modification of your circuit that solves this problem, and explain why it works.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92070552

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As