Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

These are the requirements

Topic - Autoclaved aerated concrete (AAC)

Please follow the instructions given below

CHAPTER 1

INTRODUCTION (Minimum 3 pages)

1.1 Overview of the project

Provide background information on the chosen project. Include the rationale for the project

(Why is it worth undertaking the project?).

1.2 Problem definition

Describe what the project is all about. What are you going to do? Describe the existing system / Any problem or issues, which require this project to be undertaken.

1.3 Objectives of the project

Project objectives tell what the project aims to achieve. You want to achieve your goal and the Objectives state how this will be done. What major tasks will be undertaken and what you're major Targets are. What is this project trying to accomplish and why?

1.4 Project scope

Provide the details of the work that needs to be accomplished to deliver the product with its Required features and functions.

CHAPTER 2

Methodology (Minimum 3 pages)

3.1 METHODOLOGY

Provide a comparative study of different methodologies and select a best methodology to Develop the product (if necessary). The reason for choosing a particular methodology must be Justified properly. Preferably show your methodology in a Flow Chart form as well.

3.2 Project plan

Project plan section must include various activity plans, which support in the overall guidance of the project [Communication plan, acceptance plan, resource plan, risk management plan]

References (1 page)

References must be arranged in alphabetic order. Each entry of the reference must be referred To at least once in the body of the project report (in-text citation) using Harvard referencing 20 sources shall be provided with Harvard style for the topic (Autoclaved aerated concert - AAC)

Please follow the instructions. The percentage of plagiarism shall be not more than 2%.

Number of references shall not be less than 20 of the topic.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91821202
  • Price:- $75

Priced at Now at $75, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As