Ask Civil Engineering Expert

There are two benchmark problems which AISC has adopted to find whether an analysis method meets the needs of a rigorous second-order analysis adequate for use in the Direct Analysis Method (DAM).  Article C2.1 in the Commentary of the Specification (pp 16.1-273 through 16.1-277) describes in detail these two benchmark problems. 

The closed form solutions for Δ max and Mmax are given on page 16.1-276 for several axial loads. Figure C-C2.2 summarizes the results for the first benchmark problem and Figure C-C2.3 summarizes the second.  Conduct second order analyses for both benchmark cases, using MASTAN or any other structural analysis software you choose. 

Perform:

• Apply a uniform load of 0.2 k/ft on the first benchmark problem (in the Commentary of the Specificatiok).

• Apply a horizontal wind load of 1.0 kips on the second benchmark problem (in the Commentary of the Specificatio).

• While holding these forces constant, run a series of load cases varying the axial force from 0 kips to 450 kips in increments of 50 kips (a total of 10 load cases to run) for the first benchmark problem and from 0 kips to 200 kips in increments of 20 kips (a total of 11 load cases).

• Repeat this for a 1, 10,  and 20 element model for each of the two benchmark problems.

final output :

1. A table for each for the three models showing the load case, Δmax, Mmax, both from the computer solutions and the exact, closed form solution, and the percent difference between the solutions (the solutions should agree within 3% for moment and 5% for deflection per the article).

2. Plots of P vs. Δ and M vs. Δ  from your computer results for each of the three models.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91771

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As