ASSIGNMENT BRIEF

Assignment One: Building Economics and Construction Costs

Project Scenario:

For all of the following questions, you are employed as a Quantity Surveyor for a private practice in the city of Auckland who has been asked to provide professional services for a new client. The client, Buildwise Properties, specialise in the provision of housing for sale, primarily aimed at the middle range of the property market. To date, all developments have taken place in Auckland. The proposed development will, therefore, be a new venture for the client as they intend to break into the Christchurch market.

Q1. Buildwise Properties are currently considering the redevelopment of a Brownfield site on the outskirts of Christchurch that was previously factory premises. The existing factory buildings were demolished some time ago, and all mains services will require replacement and renewal.

The site under investigation is a small site sandwiched between existing recently developed housing estates and small retail premises. A minimum of 38 units is proposed at 170 m2 per individual unit.

Task:

Identify and discuss the client's requirements in terms of Time Cost and Quality.

Q2. As this is a new venture for the company, they have asked you to provide an indication of the key factors which are likely to affect the design of the new development and so influence the project cost.

Task:

Prepare a Report for the client, highlighting the factors which you consider are likely to have a significant impact on the design solution and thus on project cost.

Q3. Having considered the design and cost implications, the company have nowasked you to provide an early indication of likely project cost before they make a final commitment to the project.

Task:

Describe how you can best utilise cost forecasting techniques and sources of cost data to enable you to meet the client's request. Provide a total cost m2 rate for the project and explain your assumptions. (20 marks theory discussion, 10 project cost and explanation)

Read the requirements for this assignment

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91915716
  • Price:- $75

Priced at Now at $75, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As