Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

The story: The Civil Engineering Department would like to have solar panels installed on the roof of Ghausi Hall to supply some of its electricity use - after all there is plenty of space on the roof and plenty of sun in Davis. Based on cost constraints the department decides it can install a 4.0 kWp system (the subscript p refers to rated power). Given the solar radiation in Davis (an annual average 5.47 kWh/m^2/day) the system could produce 7986.2 kWh/year. However, PV panels produce direct current (DC), which needs to be converted to alternating current through an inverter prior to use. Unfortunately this conversion is only 77% efficient (this is often refered to as a ‘derate factor'). There are additional inefficiencies due to (i) temperature effects on panel performance, (ii) increased inverter inefficiency at
high loads, and (iii) reflectivity of the panel surface. Summed on an average annual basis, these inefficiencies lead to an additional 10% loss of efficiency.

The photovoltaic panels: PV system manufacturing requires approximately 2300 kWh of primary (i.e. life cycle) energy per kW of rated power (2300 kWh/kWp).
Though most PV panels sold in the U.S. are produced in China, the brand selected by department are produced in Rochester MI, USA, and are transported by truck to Davis - a total distance of 2,330 miles. PV systems weigh approximately 300 lb/kWp. Freight truck energy intensity is approximately 0.025 gallons of diesel per ton-mile (assume U.S. short tons). Diesel has an energy content of 124,000 BTU/gal. In addition, 15,000 BTU of energy is used in the production of 1 gallon of diesel. Useful conversion: 1 kWh = 3412.14 Btu.

1. PV Production
a. Calculate the production energy required for a 4 kWp system. Report your answer in units of kWh.
b. Calculate the total transport energy required to deliver the PV system to the department in Davis. Report your answer in units of kWh.
c. Trains use about 1/10th the energy as trucks to move 1ton of freight 1 mile (0.025 gal/tonmi). Recalculate part b. assuming panels travel 180 miles by truck, and 2150 miles by train. Report your answers in kWh.

2. PV Electricity Production
a. Based on the location in Davis and the panel efficiency information, calculate the annual electricity production from the 4 kWp panel array.

3. Energy Indicators
a. Calculate the energy payback time - in other words - how many years does it take to produce as much energy as went into producing and transporting the PV system?
i. Assuming truck transport as in 1.b.
ii. Assuming combined truck and rail trainsport as in 1.c.
b. Assuming the PV system has a productive life of 20 years, and that there are no losses in efficiency over time, what is the net energy ratio for the system? Assume truck transport only (as in 1.b.).
c. Calculate the fossil energy intensity of PV-generated electricity (on a per-kWh basis) using the same assumptions as in 3.b. Your units will be kWh_Fossil /kWh_Generated.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9896090

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As