Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

The following test results were obtained for a 100 ml wastewater sample taken at the inlet to wastewater treatment plant.  The tests were performed using the standard methods. Determine the concentration (mg/l) of total solids, total volatile solids, total suspended solids, fixed suspended solids, total dissolved solids and fixed dissolved solids.

Tare mass of evaporating dish     = 54.6422 g

     "+ Residue after evaporation of sample at 105°C = 54.7022 g

     "+ Residue after ignition at 550°C   = 54.6842 g  

Same volume of sample is used to determine the suspended solids also.  

Tare mass of filter     = 1.5348 g

      "+ Residue after drying at 105°C = 1.5553 g

       "+ Residue after ignition at 550°C = 1.5453 g

Ans: Volume of sample = 100 mL = 0.1 L  

Total Solids (TS) = [(54.7022- 54.6422) g *1000 mg/g ]/0.1 L  = 600 mg/l  

Total Volatile Solids (TVS) = (54.7022 - 54.6842)g *1000 mg/g ]/0.1L  = 180 mg/l  

Total Fixed Solids (TFS) = (54.6842 - 54.6422)g *1000 mg/g ]/0.1L  = 420 mg/l

It can also be estimated from TFS = TS-TVS = 600-180= 420 mg/l  

Suspended Solids (TSS or SS) = (1.5553-1.5348)g*1000 mg/g ]/0.1L= 205 mg/l  

Fixed Suspended Solids (FSS ) = (1.5453-1.5348)g*1000 mg/g ]/0.1L  = 105 mg/l  

Volatile Suspended Solids (VSS) = (1.5553-1.5453)g*1000 mg/g ]/0.1L  = 100 mg/l

Or it can also be estimated by VSS = TSS-FSS = 205- 105 = 100 mg/l  

Dissolved solids can be determined from the difference between total solids and suspended solids. However, laboratories routinely determine the dissolved solids also experimentally and verify the accuracy of the results.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9556708

Have any Question?


Related Questions in Civil Engineering

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As