Ask Civil Engineering Expert

The floor plan of an office building in the preliminary stages of design is shown below. The floor space will be used for offices.

863_Figure.png

Dead Load

The floor consists of 18 gage steel 2.0 CD DECK with a 6.0 in normal weight concrete slab.

1. Compute the dead load, qD (psf), acting over the floor area. Include the weight of concrete and steel decking.

2. If the steel decking is laid out in single spans from beam to beam in the floor span direction indicated in the figure, will shoring be required during concrete pouring and curing? Explain your answer.

3. After the concrete cures and reaches its full strength, what is the maximum superimposed load (psf) that the floor can support?

4. Assuming simple connections between all members, determine the maximum shear and bending moment in each beam and girder member and the axial force in each column due to dead load. You can use Table 3-22a from the AISC Steel Manual in lieu of statics. Summarize your results in a table like the following:

 

Vmax (kip)

Mmax (kip-ft)

Pmax (kip)

B1-B4

 

 

-

B5-B14

 

 

-

G1-G4

 

 

-

G5-G6

 

 

-

C1-C4

-

-

 

C5-C8

-

-

 

C9

-

-

 

 

 

 

 

Note: you must summarize your results in a table to receive full credit.

Live Load

5. Use ASCE 7-10 Table 4.1 to determine the uniform floor live load, qL. You do not have to consider concentrated live load.

6. Assuming simple connections between all members, determine the maximum shear and bending moment in each beam and girder member and the axial force in each column due to live load. You can use Table 3-22a from the AISC Steel Manual in lieu of statics. Summarize your results in a table similar to that used for the dead load.

Reduced Live Load -

7. Determine the live load reduction factors, L/Lo, for each structural member, then determine the maximum load effects due to reduced live load. Summarize your results in a table like the following:

 

L/Lo

Vmax (kip)

Mmax (kip-ft)

Pmax (kip)

B1-B4

 

 

 

-

B5-B14

 

 

 

-

G1-G4

 

 

 

-

G5-G6

 

 

 

 

C1-C4

 

-

-

 

C5-C8

 

-

-

 

C9

 

-

-

 

Note: You must summarize your results in a table to receive full credit.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92277552

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As