The feed to VISY 8 Paper Mill comprises 450 tonne/day of waste paper (newsprint, brown boxes, ..). The paper is then pulped by mixing with clarified process water. The pulp (4 % paper fibre) then goes through stock preparation, screening and cleaning using process water prior to entering the paper machine. A variety of screens and hydrocyclones are used. The rejects from this stage go to either landfill (20 wet tonnes/d at 50% water) or are used as fuel for the boiler (60 wet tonnes/d). The pulp then enters the paper machine which consists of two major sections – wet end and dry end. In the wet end, water is removed by low pressure suction followed by pressing. A number of chemicals are added to the pulp just prior to entering the paper machine – these assist with the paper quality but their composition can be considered negligible for the purposes of the material balances.

After the wet end, the solids fraction in the paper is approx 20%. Following the wet end, the paper passes through the press section, where it is essentially pressed between large rollers which press the water out of the paper and onto the press ‘felt’ material. After the press, the solids content is between 35-50%. The dry end section consists of a number of steam-heated rollers which the paper passes over. After the dry end, the water content of the paper is 5-10%.

Water is critical to the paper production process, and it is used in most stages of the process.

Fresh water enters the process in 3 streams – approx. 0.5 ML/d enters with chemicals at the dry end of the machine, approx. 1 ML/d enters at the wet end of the machine and the boiler consumes approx. 0.2 ML/d.

There is a major water recycle system:

? The ‘clarified process water’ is used for pulping and the stock preparation, and it then enters the wet end of the paper machine with the pulp. It is separated in the wet end (suction and squeezing) as ‘process water’ and is treated in the clarification stage, which includes dissolved air flotation and sand air flotation. The flow rate entering the pulper is estimated as 9.7 ML/d. Is this correct?

? The ‘clarified process water’ is used for showers in the cleaning process of the stock preparation. The clarified water flow rate leaving the clarification section and returning to the stock preparation is approximately 25 ML/d.

The effluent (0.9 ML/d) from the clarification stage is treated in a UASB anaerobic wastewater treatment system on-site prior to discharge to the sewer for additional treatment at the Gibson Island sewage treatment plant. The UASB removes 80% of the solids that are present in the effluent from the clarification stage. The UASB produces biogas as a result of the anaerobic degredation of the solids and other compounds in the wastewater. The biogas (approx (150 Nm3/hr) is used as fuel in the boiler. The boiler also uses approximately 100 tonne/d of coal. The boiler produces 1000 tonnes/d of steam which is used for drying the paper (via heating the rollers). The condensate is returned to the boiler. The boiler produces 20 tonnes/d of ash.

Data: assume Biogas 40% CO2, 60% CH4; assume density of process water 1000 kg m-3

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91079458

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As