The Factors of Programme Delay in Construction Industry in Hong Kong

Aims

The aims of this dissertation is to investigate the factors contributing to time overrun and application of time management, techniques for contractors in Hong Kong and to make recommendation for improved practice.

Objectives

The objectives of the study are:

i. Literature review of recent research to identify the techniques used in time management by contractors in Hong Kong

ii. To investigate extent and effectiveness of the application of time management; the techniques/systems used by main contractors in Hong Kong

iii. To identify the factors influencing time management; factors cause programme overrun.

iv. To evaluate, analyze and evaluate the factors contributing to time overrun for contractors in Hong Kong

v. To make recommends for improved cost management for main contractors in Hong Kong for techniques and watch out key factors

1. The aims and objectives need to be re-phrased to indicate the scope of study clearly.

2. The scope of study need to be narrowed down (e.g. major civil construction projects, large scale building projects, or small alteration and additional works etc.) as there is limitation in time and capability of student.

3. Citation to most of the literature search is missing.

4. The literature search has NOT been completed as the following aspects planned in the objectives have not been elaborated:

a. techniques used in time management by contractors in Hong Kong

b. the extent and effectiveness on the application of time management

c. factors leading to overrun of construction projects in Hong Kong

d. ways on improvement of time management for main contractors in Hong Kong.

5. Hypothesis or research questions need to be formulated prior to data collection.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92475053
  • Price:- $430

Guranteed 48 Hours Delivery, In Price:- $430

Have any Question?


Related Questions in Civil Engineering

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As