Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

The City of London Council adopted Master Plan for Downtown London on April 14, 2015 called Our Move Forward London's Downtown Plan.

According to the Master Plan, the downtown London plays an important role in the life of Londoners. It is the cultural heart and the original neighborhood of the city. The downtown is, and has historically been, a critical employment centre and economic engine. It is a pillar of the community and provides the basis for our future prosperity by attracting people to live and invest in London.

One of the proposed project is transformation of the fork of the Thames River. The Forks of the Thames project envisions an urban walkway along the bank of the Thames River and a captivating urban park space at the foot of Dundas Street, linking activity on Dundas Place with riverfront activities. The proposed project is River views will be reestablished to reconnect the downtown and the riverfront. A 2015 design ideas competition for London's central riverfront, hosted by the London Community Foundation, will inform the development opportunities associated with this project.

Riverfronts in cities all over North America are entering a period of rejuvenation. These natural assets, which for the past many decades have not been a focus, are now becoming prominent economic development tools. Creating great riverfront public space has been a successful tool in revitalizing many downtowns, large and small, across the continent. For London, the Forks of the Thames is not only the historical founding site of our city, but it has long been the centre point of social life in London. The project details are given on page 54 of the aforementioned Master plan which can be found at:

http://www.london.ca/business/Planning-Development/downtown/Documents/Our-Move-Forward-LondonsDTPlan-adopted-April-14-2015.pdf

1. Define what is Master Plan;

2. List the effects of this proposed project on the environment by keeping in view the deifintion of the "environment" under the Environmental Assessment Act;

3. List the economic gains from the project;

4. As project engineer, how will you explain the economic gains of the proposed project vs. encroachment into the floodplain and riparian buffer;

5. Who will be your target for public consultation;

6. Consider the social context of the project; and

7. Discuss the institutional frame work for the EA considered for the project (City of London vs. UTRCA).

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91625310
  • Price:- $30

Priced at Now at $30, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As