The city of Lancaster's water distribution system has 3 wells for water supply. There are 10 pumps at these wells. It is estimated that a pumping rate of 10,000 gallons per minute is needed to satisfy the city's total water demand. There are limits on how much water can be pumped from each well: 3000 gal/min from Well 1; 2500 gal/min from Well 2 and 7000 gal/min from Well 3. There are also di erent costs of operating each pump and limits on the rate of each pump: Maximum Cost From Pump (gal/min) ($/gal/min) Well 1 1100 0.05 1 2 1100 0.05 2 3 1100 0.05 3 4 1500 0.07 1 5 1500 0.07 2 6 1500 0.07 3 7 2500 0.13 1 8 2500 0.13 2 9 2500 0.13 3 10 2500 0.13 3 Lancaster wishes to determine the least cost way to meet its pumping needs.

(a) Explain why appropriate decision variables for a model of this problem are (j = 1; : : : ; 10) xj = pump rate per minute of pump j 5

(b) Assign suitable symbolic names to the constants of the cost and maximum rate values in the table above.

(c) Formulate an objective function to minimize the cost of the pumping plan selected.

(d) Formulate a system of 3 constraints enforcing well capacities

(e) Formulate a system of 10 constraints enforcing pump capacities

(f) Formulate a single constraint enforcing the overall pumping requirement

(g) Complete your model with an appropriate system of variable type constraints

(h) Is your model best classi?ed as an LP, NLP, ILP or INLP? Is it single or multi-objective? (i) (OPTIONAL) Solve this problem using GAMS

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9894440

Have any Question?


Related Questions in Civil Engineering

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As