Ask Mechanical Engineering Expert

The aim of this assignment is for the student to use the information, data and analysis techniques presented during lectures to design a belt drive transmission for a ventilation fan.

Objectives: By the end of this assignment the student should be able to:

• Know and understand the use of standard analytical techniques to prove a design.

• Create and synthesise solutions to mechanical engineering problems.

• Apply modelling and drawing techniques using CAD.

• Locate information on and select materials and preparatory parts for particular purposes including bearings, ‘v' belts, pulleys, etc.

An ‘axial fan' is required to move air for ventilation purposes within an industrial building. The requirements for this fan are that the electric motor cannot be connected directly to the fan drive shaft but must sit outside the cowling and drive the fan by means of Wedge Drive Belts. Due to the operating requirements for adequate ventilation, the fan itself is Φ0.788m diameter and 0.147m long. To the central hub of the fan, a fan shaft can be attached as is deemed appropriate. It has already been established that, for the type of fan being used and its operating capacities, it will rotate at 750 rev/min and at a power requirement of 0.91kW. The cowling, support for the fan shaft, drive system, motor selection and motor mounting have yet to be decided and/or designed.

The cowling is to be a round tube, sufficient to house the fan and its support and secure the motor on its outside surface. The cowling should also have a flange at each end so that it can be connected up to ventilation ducting. The method of securing the whole assembly in its place of operation is not considered here and need not be designed for.
The air temperature varies from 10oC in winter to 35oC in summer with little humidity but carrying a substantial amount of dust and light debris.

The ventilation system is to operate all day and every day, 365 days a year, without maintenance except for checking and changing belts, pulleys, motor, etc, at their required service period. Any planned maintenance should result in as little ‘down-time' as possible.

It has already been decided that the transmission will consist of; an AC Electric Motor and ‘V' Belt drive. The actual motor, belts, pulleys, etc, have yet to be chosen and decided. 3 Phase 50Hz electric supply is available.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M9525763

Have any Question?


Related Questions in Mechanical Engineering

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Force exerted by jet on moving cart1 you need to determine

Force Exerted By Jet On Moving cart. 1. You need to determine the velocity of water that comes out from the nozzle of this system. need the equation please formulate the equation. 2. This water will strike a small cart a ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Materials behaviour from atoms to bridges assignment -

Materials Behaviour from Atoms to Bridges Assignment - Distributed loads and static equilibrium (Please note: you should show your steps with necessary figures) Q1. Two beam sections are jointed at C and supported at A b ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As