Ask Electrical & Electronics Expert

Task 1 - Multi-floor planning using ESS

You are required to perform a planning operation for a simple multi-floor environment.  The floor plan details are shown in appendix 1. The building is a multi-floor (3 floors)multi-tenant office building and you must simulate this multi-floor environment in ESS.The 1st floor, which you are to design for, is a high occupancy area, with 100 clients requiring high speed access and 50 voip phones.

The ground and 2nd floors are already occupied by tenants already using Wi-Fi.

The APs for the ground and 2nd floors are shown on the plan. A survey suggests that the ground floor APs both operate on Channel 1 in B mode only. The APs on the 2nd floor operate on Channel 1 and 6 in G mode.

You need to deploy APs on the 1st floor operating in the 2.4 GHz range to best support the requirements.

In carrying out your simulation work, partially because the requirements are not precise, you will need to make a number of assumptions.  These assumptions must be made very clear and need to be reasonable in nature.

Task 2 - Performing a wireless site survey

You are to perform a full ESS survey of Ellison building D and E block ground floor, including the Zone and the public area outside the Zone between Ellison building and the Gym/Go-Cafe.  The client (the University) wants to ensure it has excellent wireless coverage within the building and in the space between the buildings.  You only need to survey student accessible spaces.

CAUTION

Care must be taken carrying out the survey outside the buildings.  This is a public area and you must respect other users of the space. 

You need to report your method, results and recommendations.

Task 3 - Wireless deployment and testing

Based on your results for Task 2, you are to choose one section of your area, where you believe coverage is inadequate and install one or more access points at optimal locations.  Measure the impact of the installed access points. 

For the remainder of the area, you should perform predictive planning (as in Task 1) to ascertain how to attain full and proper coverage.

Report your method, results and discussions around the results. The discussions should include costing for any additional equipment required and installation costs to provide desired highest quality coverage.

Electrical & Electronics, Engineering

  • Category:- Electrical & Electronics
  • Reference No.:- M91192877

Have any Question?


Related Questions in Electrical & Electronics

Question 1for the ce amplifier in figure 1 given the

Question 1 For the CE amplifier in Figure (1), given the following component parameters: Parameter Value β DC , β AC 150 V BE 0 . 7 V V CC 12 V R C 820 ? R E 1 100 ? R E 2 220 ? R 1 20 k? R 2 5 . 2 k? R L 100 k? C 1 , C ...

Question -i a star-connected three-phase synchronous

Question - (i) A star-connected, three-phase synchronous induction motor takes a current of 10 amps from a 415 volt supply at unity power factor when supplying a steady load. If the synchronous reactance is 5 ohms/phase ...

1 a name the three major groups of contamination and

1. (a) Name the three major groups of contamination and briefly describe their physical characteristics. (b) Where do the above contamination types come from? Give one example of each. 2. Name two processes metrics which ...

Question 1 in the voltage regulator circuit in figure p221

Question 1: In the voltage regulator circuit in Figure P2.21, V 1 = 20 V, V Z = 10 V, R i = 222Ω and P z (max) = 400 mW. (a) Determine I L, I z , and I L , if R L = 380Ω. (b) Determine the value of R L , that will establ ...

Summative assessmentin 2017 sej101 assessment will consist

Summative Assessment In 2017 SEJ101 assessment will consist of nine tasks that will develop a portfolio of your assessed work. Throughout the trimester you will have the opportunity for feedback on all nine tasks before ...

1 a name the three major groups of contamination and

1. (a) Name the three major groups of contamination and briefly describe their physical characteristics. (b) Where do the above contamination types come from? Give one example of each. 2. Name two processes metrics which ...

1 a name the three major groups of contamination and

1. (a) Name the three major groups of contamination and briefly describe their physical characteristics. (b) Where do the above contamination types come from? Give one example of each. 2. Name two processes metrics which ...

Case studythis assignment consists of a written report of

CASE STUDY This assignment consists of a written report of approximately 1000 words and any diagrams in which you are asked to critically compare different process methods used to achieve the same result and show an awar ...

Problem 1 a two-phase servomotor has rated voltage applied

Problem 1: A two-phase servomotor has rated voltage applied to its excitation winding. The torque speed characteristic of the motor with Vc = 220 V, 60 Hz applied to its control phase winding is shown in Fig.1. The momen ...

Electrical engineering questions -q1 two ideal voltage

Electrical Engineering Questions - Q1. Two ideal voltage sources designated as machines 1 and 2 are connected, as shown in the figure below. Given E 1 = 65∠0 o V, E 2 = 65∠30 o V, Z = 3Ω. Determine if Machine 1 is genera ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As