SURFACE WATER HYDROLOGY

Problem 1

A hypothetical map for a rural catchment near Ballarat, Victoria is shown in Figure 1. Your task is to estimate the runoff hydrograph at the outlet of the catchment for a 10 year ARI using the software RORB.

513_Figure.png

Figure 1: Rural catchment with sub-catchments and respective areas.

Note:
- Make appropriate assumptions (and list these) regarding the impervious fraction of each sub- catchment area along with the initial losses and continuing losses;
- Use approximate reach lengths between nodes (and list these) noting that sub-catchment nodes are at the centroid;
- Use Ballarat IFD data (to be obtained from www.bom.gov.au) to estimate the runoff ;
- Obtain the runoff hydrograph from the entire catchment;
- Check for time of concentration, tc, value and if it is unrealistic, adjust the K value in the model noting that the K value can be as high as 50 or 60.
- Provide a graph of the hydrograph you obtain along with a tabular summary of your outputs.

Refer to the RORB user's manual for additional information.

Problem 2

Download a copy of HEC-RAS software and its user manual (version 5.0). Complete the example application described in Chapter 4 of the HEC RAS User's Manual Version 5.0 (February 2016).

Submit all of the appropriate project files and results of your work for assessment.

Problem 3

Summarise your work for questions 1 and 2 in a brief report. This report should include an introduction, documentation of any assumptions made, and neatly present the important results. You must also provide a brief conclusions to your work. The report should be about 5 pages including examples of your results, all discussion, a conclusion and any references you may have made.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92324438
  • Price:- $120

Guranteed 48 Hours Delivery, In Price:- $120

Have any Question?


Related Questions in Civil Engineering

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As