Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Surface and Sub-surface Hydrology

Q1) Consider the rainfall event having 5-min cumulative rainfall record given below:

a) What is the duration of the entire rainfall event and the corresponding total rainfall amount?

b) Find the rainfall depth hyetograph (in tabular form) with 10-min time interval for the storm event.

c) Find the maximum 10-min and 20-min average rainfall intensities (in mm/hr) for the storm event.

Time (min)

Cumulative rainfall (mm)

0

0

5

7

10

14

15

23

20

34

25

45

30

58

35

70

40

81

45

91

50

100

55

110

60

119

65

125

70

131

75

136

80

140

85

140

Q2) An experimental rectangular plot of 10 km x 12 km has five rain guage stations as shown in the figure below. The storm rainfall and coordinates of the stations are given in the table. Based on the position of the five rain gauges, construct the Thiessen polygon for them and estimate the mean annual rainfall that falls on the plot.

Station

(x,y)

Mean annual rainfall (cm)

A

(1, 3)

128

B

(8, 11)

114

C

(3, 10)

136

D

(5, 8)

144

E

(7, 5)

109

Q3) Consider a 2-hr storm event with a total rainfall amount of 80 mm. the measured direct runoff volume produced by the storm is 40 mm.

a) Determine the decay constant k in Horton's infiltration model knowing that the initial and ultimate infiltration rates are 30 mm/hr and 2 mm/hr, respectively.

b) Use the Horton equation developed in Part (a) to determine the excess rainfall intensity (mm/hr) hyetograph for the following storm event.

Time (min)

0-10

10-20

20-30

Incremental rainfall depth (mm)

5

20

10

Q4) Consider the following storm event given below for a small catchment of 120 hectares. For baseflow of 0.05 m3/s:
a) Compute the volume of direct runoff (in mm),

b) Assuming initial losses (abstraction) are 5 mm, determine the value of the Φ-index (in mm/hr)

c) The corresponding effective rainfall intensity hyetograph (in mm/hr)

Time (min)

Cumulative rainfall (mm)

Discharge (m3/s)

0

0

0.05

5

5 (initial loss)

0.05

10

20

0.25

15

35

0.65

20

45

0.35

25

 

0.15

30

 

0.05

Q5) Obtain a Unit Hydrograph for a basin of 273.6 km2 of area using the rainfall and streamflow data tabulated below. Assume baseflow to be 150 m3/s.

Time (h)

Rainfall (cm)

Observed Hydrograph (m3/s)

0

0

150

1

0.25

150

2

2.75

350

3

2.75

800

4

0.25

1200

5

 

1100

6

 

650

7

 

400

8

 

300

9

 

200

10

 

150

11

 

140

Q6) The following table contains the records of rainfall and runoff data of a particular storm event for a watershed with drainage area of 8.4 km2:

a) Determine the maximum rainfall intensity for durations of 30 min, 60 min, and 120 min.

b) Determine the percentage of total rainfall that is abstracted (lost) and does not contribute to runoff.

Time Of day

Cumulative rainfall (mm)

Instantaneous Runoff (m3/s)

4:00

0

0.0

4:30

30

0.3

5:00

80

4.2

5:30

90

11.3

6:00

95

13.0

6:30

127

34.0

7:00

130

45.3

7:30

132

21.2

8:00

 

9.3

8:30

 

4.8

9:00

 

2.5

9:30

 

1.4

10:00

 

0.8

10:30

 

0.0

Total

 

148.1

Q7) The parameters for Horton's equation are f0 = 3.0 in/h, fc = 0.5 in/h, and K = 4.0 h-1. Determine the infiltration rate and cumulative infiltration at 0.25-hr increments up to 4 hr from the beginning of infiltration. Assume continuous ponding.

Q8) Using the 1-hr unit hydrograph shown below, determine the direct runoff hydrograph for a 3-hr storm in which 1 in of excess rainfall occurred in the first hour, 2 in the second hour, and 0.5 in the third hour.

What is the area of the watershed in mi2?

Time period

Unit hydrograph (cfs)

0

0

1

100

2

300

3

500

4

700

5

400

6

200

7

100

8

0

Q9) A 600-hectare farm land receives annual rainfall of 2500 mm. There is a river flowing through the farm land with inflow rate of 5 m3/s and outflow of 4 m3/s. The annual water storage in the farm land system increases by 2.5 x 106 m3. Assuming there is no groundwater flow, then based on the system hydrologic budget equation, determine the annual evapotranspiration amount (in m3). [ Note: 1 hectare = 10,000 m2 ]

Q10) For the basin shown below, use (a) the Average method, b) The Thiessen method, and c) The Isohyetal method to estimate the average rainfall (in mm) on the basin.

331_Figure.jpg

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92023490
  • Price:- $90

Guranteed 48 Hours Delivery, In Price:- $90

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As