Ask Civil Engineering Expert

Suppose you are the director of operations for the southeast region for consumer electronics retailer BigBuy. You have been asked by the chief operating officer of the company to review the inventory management processes and procedures in place at all BigBuy retail outlets in your region. Accordingly, you have gathered some data from the store managers and regional DC managers. To begin understanding the stocking processes, you start with a single stock-keeping unit (SKU) at a single retail outlet, a 19-in. LCD computer monitor that is sold at BigBuy's largest store in Raleigh, NC. The data you have collected indicates the following:

• Average demand for this SKU is about 5 units per day, which equates to 1800 units per year on BigBuy's operating schedule of 360 days per year.

• The DC manager indicates that the DC's operating policy specifies next-day fulfillment for all orders placed by retail outlets prior to 6 p.m. on any given day.

• The cost of placing a replenishment order at the retail store is estimated to be $6.25, which covers various administrative functions like entering the day's orders on the Intranet-based ordering system and receiving daily shipments, sorting them, and stocking them in the store room.

• BigBuy's corporate accounting standards specify a 25% inventory holding cost rate for all retail outlets.

• The cost (to BigBuy-i.e., cost on its accounting books) of this 19-in. LCD monitor is $100.

• Since this is a relatively fast-moving item at this store, the current replenishment policy calls for daily (on average) replenishments (i.e., an order quantity of 5 units).

a. Is this a good replenishment policy? What is the annual cost of this replenishment policy?

b. Is the current replenishment policy optimal? If so, why? If not, what needs to change for daily replenishments to be optimal?

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92218474

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As