problem 1: Sketch the water surface profiles for the cases below. Label the normal and critical depth lines as well as all of the water surface profiles.

1396_normal and critical depth lines.jpg

In part (b), the conjugate depth of the normal depth in channel section A is greater than the normal depth in section B. The conjugate depth of the normal depth in section C is less than the normal depth in section D.

problem 2: An early horizontal,12ft wide rectangular channel carries 60 cfs at a depth of 3.0 ft. The width of the channel is smoothly contracted to 6 ft at the downstream section.

(a) Determine if the flow will choke and both the downstream and upstream water depths.

(b) If there is also a 1 ft high step up in bottom elevation at the contraction, determine if the flow will choke and both the downstream and upstream water depths.

problem 3: A rectangular channel of width 12fth as an upstream slope of 0.02ft/ft and a downstream slope of 0.0005 ft/ft. Both reaches have lengths of 500 ft. The upstream reach has a Manning’s roughness of 0.016 and the downstream reach has a roughness of 0.011. The design discharge is Q = 460cfs, the low flow discharge is Q = 230cfs, and the flood discharge is Q = 690cfs.

a) Using the direct step method by hand with 1 step, determine the location of the hydraulic jump relative to the slope break for the design discharge. Classify the jump type and find out the energy lost.

b) Design an Excel spreadsheet to find out the location of the hydraulic jump relative to the slope break using a depth step size of 0.01 ft for the design discharge. All lengths and water depths must be accurate to 2 decimal places. Plot the water surface profile relative to the slope break.

problem 4: In HEC-RAS, model this system as 1 reach with cross-sections every 2 ft. For all 3 discharges (labeled as: design, low, flood),

a) Determine the water depths 10 ft from the upstream and downstream boundaries.

b) Determine the location of the hydraulic jumps (in ft from the slope break).

c) Output the water surface profile plots with all 3 discharges, including the water surface, energy grade line, and critical depth line.

problem 5: Consider a trapezoidal channel with a bottom width of 4 m, side slopes of 3:1 (H:V), and a bottom slope of 0.002 that carries 50 cms. The channel has a Manning’s roughness of 0.034.

a) Using the standard step method, determine the water depth 40 m up-stream of a location with a depth of 2 m.

b) Design an Excel spreadsheet to find out the following reach steps. All lengths and water depths must be accurate to 2 decimal places.

643_reach steps.jpg

Plot the water surface profile.

problem 6: For the model of Fall River and Butte Creek (Chapter 4 in the User Manual) in HEC-RAS,

a) Output the cross-section of all three Flood events for station 9.8 on one figure. Include only the water surface and energy grade line.

b) Output the profile of Butte Creek and the Lower Reach of the Fall River for all events on one figure. Include only the water surface and energy grade line.

c) Output the three dimensional view of the water surface profile the 50 year flood. Use a rotation angle of 25 degrees and an azimuthal angle of 30 degrees.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9352

Have any Question? 


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As