Short-Term Scheduling And Control

The major objective at this stage is to make sure the efficient and smooth operation of the system in the event of unforeseen disturbances. These disturbances are produced via inherent variability related along with the events under disruptive and consideration events as like: equipment failure or tool breakage.  Ultimately, any planned sequence of activities will need updating throughout its execution. The solution approaches can be categorized into three major groups: rescheduling, simulation and dispatching.

Dispatching in its simplest form contain by using rules-of-thumb to improve the system from disruptions. A more complicated form of dispatching makes explicit utilization of stochastic information as like: processing time or machine breakdown possibility distributions.

Simulation is frequently proposed as a real-time evaluation method of the proposed control actions.  A  problem  in  utilizing  simulation  is  the  computer  time  need  to  get important differences among alternatives. Within 'perturbation analysis' the system is modeled like a Discrete Event Dynamic System or DEDS and approximations of the desired statistics are acquired by using a minute number of reapplications.

The other line of interests reasons 'rescheduling as a mean to recovering the system from a disruption. This implies as a mean to recovering the system from a disruption. This signifying the existence of a pre computed schedule and a group of control actions. For illustration, a control  action  may  lead to  re-routing  of  a  part  firstly  destined  for  processing  on  a machine which has just failed. Rescheduling decisions should be aimed at keeping high system presentation. A desirable feature of rescheduling is which of minimizing the deviations from the unique plan.  The latter can be dangerous in computer controlled system, as a change in sequence may need the reordering of the parts previously in the queue, or not essential machine setup changes. Whole or partial rescheduling is performed to improve the system from disruptive events. Individual approach is sum of rescheduling. The disadvantage of latter is which no consideration is specified to the impact that rescheduling has might have on the system. Match-up scheduling efforts to mitigate the effect of rescheduling via finding out a time period inside that the system will 'match-up' along with the original plan. Individual researcher Leon modeled the control problem like a DEDS model that minimizes a linear combination of part completion deviations and times from the innovative schedule. This presentation permitted the incorporation of not specific information into this dynamic decision problem.

A significant aspect of scheduling is that the time and frequency of rescheduling. Not many researchers suggest that making rescheduling decisions while the system's reliability reaches a specified threshold level or machine breakdown arises. In dynamic parallel machine systems, they studied also the worst-case behavior of periodic rescheduling. Their effects suggest advantages related along with the utilization of periodic, quite than continuous, rescheduling.

For execution, the scheduling decisions under consideration are directly implemented; random disturbances will eventually disrupt the system operation. These disturbances are makes from a broad range of sources comprising demand variability, and equipment reliability, the unspecific related along with model parameters. An illustrated characteristic of a schedule within a computer-controlled environment is, which, it is insensitive, or robust, to slight random disturbances. Via robust this is meant that the system presentation will be maintained along with slight adjustments to the schedule, if some. Illustration of small disturbances comprises variations in processing times, short part jamming, short machine breakdowns, and others. The utilization of robust schedules must minimize the efforts needed by execution and rescheduling control. Notice that, within systems where human intervention is permitted, most small disruptions can be simply fixed via the operator and no particular consideration may be needed throughout scheduling.                     

 

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M9526187

Have any Question?


Related Questions in Mechanical Engineering

Question - truss structureconsider the three membered

Question - Truss Structure Consider the three membered planar truss structure shown in the figure below. All members of the truss have identical square cross-sectional area (A) of 25 mm x 25 mm, and Youngs Modulus (E) = ...

5star questions amp answers1a define heat treatment bname

5 STAR QUESTIONS & Answers 1. A) Define Heat treatment B) Name different types of heat treatment processes C) Write any 4 purposes of Heat treatment 2. Explain various Heat treatment processes 3. A) Compare Thermo plasti ...

Fluid mechanics assignment - viscous flow in pipesq1 as

Fluid Mechanics Assignment - Viscous Flow in Pipes Q1. As shown in the figure below, water "bubbles up" 3 in. above the exit of the vertical pipe attached to three horizontal pipe segments. The total length of the 0.75-i ...

Life cycle assessmentfor your chosen service eg white board

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Fluid mechanics assignment - finite control volume analysis

Fluid Mechanics Assignment - Finite Control Volume Analysis and Dimensional Analysis Q1. The wind blows through a 7ft × 10ft garage door opening with a speed of 5 ft/s as shown in the figure. Determine the average speed, ...

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As