1. What are the processes for developing a new mine in Australia? Give your answer as per your geographic location.

2. What are strategic risks? How would you manage these risks?

3. Define short, medium and long term planning?

4. Discuss some of the factors that an engineer needs to account for when planning a mining operation.

5. What techniques of pit optimisation are available?

6. Define the following in relation to network techniques (CPM and PERT)
a) Earliest start time
b) Latest start time
c) Earliest finish time
d) Latest finish time
e) Slack
f) Float

7. Discuss the floating cone process.

8. Describe three problems with regard to the application of the floating cone technique. What are the positive aspects of the floating cone technique?

9. Summarise the steps in the Lerchs-Grossmann 2D algorithm

10. Define the terms:
a) Project year
b) Production year
c) Calendar year

11. Summarise the basic concepts behind Lane's algorithm

12. A project is defined by the list of activities detailed in Table 1.
a) Draw the network as an activity on the arc network
b) Find the critical path
c) Find the slack for each activity

Table 1

Activity

 

Immediate predecessors

Duration days

 

A

-

3

B

-

4

C

-

3

D

C

2

E

B

1

F

A

5

G

B

2

H

B

3

I

C

11

J

D, E

3

K

F, G

1

L

K

4

M

J, H

4

13. The network shown in the next diagram is to be used in the planning of the installation of an underground crusher station. Determine the total project time and the critical path.

754_Figure.jpg

14. Cut-off Grade

Following are the variables for choosing the "Optimum Cut-off Grade":
M = maximum amount of material that the mine can produce in any given time (mine capacity)
C = maximum amount of ore that can be put through the concentrator in any given time (mill capacity)
R = maximum amount of final product that can be produced in the given time period
(production capacity)
m = mining costs, $/t of material mined c = concentrator cost, $/t of ore milled r = smelting, refining, packaging, insurance cost, $/kg of final product f = fixed cost
s = selling price y = recovery
T = length of production period
Qm = quantity of material to be mined
Qc =quantity of ore sent to the concentrator
Qr = amount of product actually produced over this production period

A. Using these above variables, develop the basic equations for

a) total cost, Tc

b) revenue, R

c) profit, P

B. Develop the equations for cut-off grade assuming that

a) mining rate is the governing constraint

b) concentrating rate is the governing constraint

c) refining rate is the governing constraint

15. Define the following terms used with respect to the Lerchs-Grossmann 3D algorithm

a) Directed arc

b) Edge

c) Weight

d) Node

e) Graph

f) Directed graph

g) Sub graph

h) Closure

i) Maximum closure

j) Circuit

k) Chain

l) Cycle

m) Path

n) Tree

o) Root

p) Branch

q) Twig

16. DESIGN PROJECT

The following describes a selection of mineral deposits. The candidate (Note: choose only anyone) is required to select a suitable mining method for the deposit based on the information given and to describe the mining system in detail. For whichever mineral deposit is selected, the candidate should include in their answer the following as required:

1. Describe suitable surface connection(s).

2. Detail development requirements

3. Detail Production requirements including a full description of the method selected.

4. Number of production unit's required/rate of production.

5. Describe loading/haulage requirements

6. Equipment

7. Briefly describe ventilation/drainage/power requirements

8. Personnel

9. Safety

10. Detail permitting and other requirements as required by the local regulator (students can select which jurisdiction the mine is located in from any Australian state or territory)

Students should also report on other salient points as required by the mining system. For economic analysis, use current market prices in A$ for the commodity as required. Accurate costings are not an essential aspect to the project but some notional costings should be undertaken to illustrate the viability of the method detailed.

UNDERGROUND MINING PROJECT

A massive silver/lead/ zinc deposit approximately 250 m in width and 1,500m long ranging in depth from 300m below surface to 900m below surface. Angle of dip is 70°.

SURFACE MINING PROJECT

A copper-gold-silver mine is located in a desert at an elevation of 3,050 m above sea level. Production is 46.9 Mt/y of sulphide ore grading 1.9% copper, containing 776,400 t of copper, 129,000 oz of gold and 3.28 Moz of silver.

The deposit is related geologically to three porphyry bodies intruded along a major fault system. Primary hydrothermal sulphide ore grades at between 0.2% and 1% copper. Subsequent weathering and uplifting created a barren, leached cap, up to 180 m thick, over a high-grade supergene enriched ore, both overlying the primary sulphides. Primary sulphide mineralisation includes pyrite, chalcopyrite and bornite, with covellite and chalcocite in the enriched zone. Some areas contain significant oxide copper oxides overlying the sulphides.

Proven and probable reserves estimated at 1,990 Mt grading 1.23% copper. Initial mining reserves totaled 662 Mt grading 2.12% copper. The stripping ratio will average around 1.7:1 over the full life of the project.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91827437
  • Price:- $150

Priced at Now at $150, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As