Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Requirements of Good Building Stones         

Here described requirements of good building stones:

  • Strength: The stone should be capable to resist the load coming on it. Ordinarily it is not of primary concern since all stones are with good strength. Though in case of large structure, it can be necessary to verify the strength.
  • Durability: selected Stones should be capable of resisting adverse effects of natural forces like, rain, wind and heat.
  • Hardness: The stone utilized in floors and pavements should be capable to resist abrasive forces which are caused by movement of people and materials over them.
  • Toughness: Building stones should be tough sufficient to sustain stresses developed due to vibrations. The vibrations can be raised due to the machinery mounted over them or loads moving over them.Stone aggregates used in the road constructions should be tough.
  • Specific Gravity: Heavier variety of stones should be used for the construction of retaining walls, dams, docks and harbors. The particular gravity of good building stone is between the range 2.4 and 2.8.
  • Porosity and Absorption: Building stone should not be porous. If it is porous rain water will enters into the pour and reacts with stone and crumbles it. The freezing of water in pores occurs and it results into the disintegration of the stone in higher altitudes.
  • Dressing: Giving required shape to the stone is known dressing. It should be simple to dress so that the cost of dressing is reduced. Yet the care should be taken so that, It is not be at the cost of the required strength and the durability.
  • Appearance: In case of the stones to be utilized for face works, where appearance is a primary requirement, its ability and color to receive polish is an important factor.
  • Seasoning: Good stones should be free from the quarry sap. Laterite stones should not be utilized for 6 to 12 months after quarrying. They are permitted to get rid of quarry sap by the action of nature. This procedure of removing quarry sap is known seasoning.
  • Cost: Cost is an essential consideration in choosing a building material. Closeness of the quarry to building site brings down the price of transportation and therefore the cost of stones comes down.

On the other hand it may be noted that not a single stone may satisfy all the requirements of a good building stones, as one requirement can oppose another. For instance, durability and strength requirement contradicts ease of dressing requirement. Therefore it is necessary that site engineer looks into the properties needed for the intended work and choose the stone.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9511764

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As