Renewable Energy and Distributed Generation Assignment-

Problem 1: Suppose a wind turbine has a cut-in wind speed of 5 m/s and a cut-out wind speed of 25 m/s. If the winds the turbine sees have Raleigh statistics with an average wind speed of 9 m/s,

a. For how many hours per year will the turbine be shut down because of excessively high speed winds?

b. For how many hours per year will the turbine be shut down because winds are too low?

c. If this is a 1MW turbine, how much energy (kWh/yr) would be produced for winds blowing at or above the rated wind speed of 12 m/s?

Problem 2: Consider the design of a homebuilt wind turbine using a 350W generator. The goal is to deliver 70 kWh in a 30-day month.

a. What capacity factor would be needed for the machine?

b. If the average wind speed is 5 m/s, and Rayleigh statistics apply, what should the rotor diameter be if the CF correlation is used?

c. How fast would the wind have to blow to cause the turbine to put out its full 0.35 kW if the machine is 20% efficient at that point?

Problem 3: Using the given data below

a. Using Matlab or Excel, plot the histogram representation of the given data?

b. Set up an excel spreadsheet to determine average wind speed v and the average value of v3, and the average power available in the wind W/m2.

c. Using the calculated average wind speed, Plot using Matlab or excel Raleigh distribution function that fits the histogram plot. Determine the corresponding scale factor c.

v(m/s)

Hrs/Yr

0

24

1

276

2

527

3

729

4

869

5

941

6

946

7

896

8

805

9

690

10

565

11

444

12

335

13

243

14

170

15

114

16

74

17

46

18

28

19

16

20

9

21

5

22

3

23

1

24

1

25

0

Totoal hrs

8.760

Problem 4: Suppose that a NEG Micon 64-m diameter wind turbine having a rated power of 1500 kW is installed at a site having Rayleigh wind statistics with an average wind speed of 7 m/s at the hub height.

a. Set up an excel spreadsheet to Find the annual energy generated.

b. Calculate the annual energy generated using the capacity factor theory? Compare your result with part a?

 c. From the result in part a, find the overall average efficiency of this turbine in these winds.

 d. Find the productivity in terms of kWh/yr delivered per m2 of swept area.

Manufacturer: Rated Power (kW): Diameter (m): Avg. Windspeed

NEG Micon 1500 64

v (m/s)

v (mph)

kW

0

0

0

1

2.2

0

2

4.5

0

3

6.7

0

4

8.9

9

5

11.2

63

6

13.4

159

7

15.7

285

8

17.9

438

9

20.1

615

10

22.4

812

11

24.6

1012

12

26.8

1197

13

29.1

1340

14

31.3

1437

15

33.6

1490

16

35.8

1497

17

38

1491

18

40.3

1449

19

42.5

1413

20

44.7

1389

21

47

1359

22

49.2

1329

23

51.5

1307

24

53.7

1288

25

55.9

1271

26

58.2

0

Problem 5: Using the wind speed modeling method described below, use Matlab or Excel to calculate the capacity factor and the annual average power produced by 1.5 MW that has the following specifications:

  • Rated power = 1.5 MW
  • Turbine diameter = 77 m,
  • Cut-in wind speed = 3.5 m/s,
  • Rated wind speed = 14.5 m/s
  • Cut-out wind speed = 25 m/s

Plot the histogram representation of the given data. Plot also using Matlab or excel Raleigh distribution function that fits the histogram plot?

Do only question 3, 4 & 5.

Attachment:- Distributed Generation Assignment.rar

Electrical & Electronics, Engineering

  • Category:- Electrical & Electronics
  • Reference No.:- M91983466

Have any Question?


Related Questions in Electrical & Electronics

Question 1for the ce amplifier in figure 1 given the

Question 1 For the CE amplifier in Figure (1), given the following component parameters: Parameter Value β DC , β AC 150 V BE 0 . 7 V V CC 12 V R C 820 ? R E 1 100 ? R E 2 220 ? R 1 20 k? R 2 5 . 2 k? R L 100 k? C 1 , C ...

Question -i a star-connected three-phase synchronous

Question - (i) A star-connected, three-phase synchronous induction motor takes a current of 10 amps from a 415 volt supply at unity power factor when supplying a steady load. If the synchronous reactance is 5 ohms/phase ...

1 a name the three major groups of contamination and

1. (a) Name the three major groups of contamination and briefly describe their physical characteristics. (b) Where do the above contamination types come from? Give one example of each. 2. Name two processes metrics which ...

Question 1 in the voltage regulator circuit in figure p221

Question 1: In the voltage regulator circuit in Figure P2.21, V 1 = 20 V, V Z = 10 V, R i = 222Ω and P z (max) = 400 mW. (a) Determine I L, I z , and I L , if R L = 380Ω. (b) Determine the value of R L , that will establ ...

Summative assessmentin 2017 sej101 assessment will consist

Summative Assessment In 2017 SEJ101 assessment will consist of nine tasks that will develop a portfolio of your assessed work. Throughout the trimester you will have the opportunity for feedback on all nine tasks before ...

1 a name the three major groups of contamination and

1. (a) Name the three major groups of contamination and briefly describe their physical characteristics. (b) Where do the above contamination types come from? Give one example of each. 2. Name two processes metrics which ...

1 a name the three major groups of contamination and

1. (a) Name the three major groups of contamination and briefly describe their physical characteristics. (b) Where do the above contamination types come from? Give one example of each. 2. Name two processes metrics which ...

Case studythis assignment consists of a written report of

CASE STUDY This assignment consists of a written report of approximately 1000 words and any diagrams in which you are asked to critically compare different process methods used to achieve the same result and show an awar ...

Problem 1 a two-phase servomotor has rated voltage applied

Problem 1: A two-phase servomotor has rated voltage applied to its excitation winding. The torque speed characteristic of the motor with Vc = 220 V, 60 Hz applied to its control phase winding is shown in Fig.1. The momen ...

Electrical engineering questions -q1 two ideal voltage

Electrical Engineering Questions - Q1. Two ideal voltage sources designated as machines 1 and 2 are connected, as shown in the figure below. Given E 1 = 65∠0 o V, E 2 = 65∠30 o V, Z = 3Ω. Determine if Machine 1 is genera ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As