Question: Development of a methodology to solve embedded walls following the free earth support method.

The objective of this project is the development of an automatic methodology to solve embedded walls following the free earth support method as explained in class. The problem can be generally described as an anchored sheet pile wall which is constructed to retain soil to a height h. The surface of the retained soil will be horizontal and level with the top of the wall.

All round pressure (kPa) 100 200 400 800
Deviatoric stress (kPa) 452 908 1810 3624

1. Plot the Mohr-Coulomb failure criterion in terms of the alternative criteria (s', t), (σ1', σ3') and (p', q) and obtain the shear strength parameters of the soil after a suitable linear best t analysis.

2. Following EC7, take a material factor of safety of Υm = 1.25 in order to reduce the shear strength parameters of the soil.

3. Display in a graph the distribution of e ective vertical and horizontal stresses as a function of depth.

4. Display in a graph the residual moment and the anchored force as a function of the depth of penetration d. This graph will help you estimate the depth of penetration.

5. Determine accurately the penetration depth after solving the resulting algebraic cubic equation (you can use the bisection method, the secant method or the Newton-Raphson method).

Display a convergence curve along with a table showing the convergence of the method.

6. Determine accurately the force in the tie rod.

7. Display in a graph the distribution of the shear force diagram and the bending moment diagram in the embedded wall. See Figure 5(a).

8. Display in a graph the deformation of the embedded wall (for simplicity, considered it clamped at the bottom end). Select a suitable E  I constant for the embedded wall (you can use numerical integration if you wish). See Figure 5(b).

9. Display in a graph the anchor force and the depth of embedment as a function of the anchor location ho. See Figure 6.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91087045

Have any Question?


Related Questions in Civil Engineering

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As