Question 1:

The selection of the most appropriate procurement route is important to the successful implementation of a construction project.

a) Name and briefly explain the main procurement methods used in the construction industry.

b) Tabulate the main difference of them stating one advantage and one disadvantage of each method over any selected one method.

c) "The Client needs to have a high degree of price certainty at the beginning of the project". Which procurement method is the best in this case? Briefly justify your answer.

Question 2

a) Safety and Health plays a key role in any industry. Explain why the management of safety and health is so important in the construction industry

b) Southern Highway construction was a landmark project implemented in Sri Lanka in the recent past. Assume you would be assigned as Health & Safety Engineer in the planned Northern Expressway project. What kind of general safety methods and health guidelines would you follow in such a project?

c) Sustainability considers as an important element in modern day construction projects. Justify your answer.

Question 3

a) Triple constraints play an important role in any project. Define them and explain why they are important.

b) Elaborate the following statements with regard to the triple constraints.

i. Different approaches to be made when designing for a cost and costing of a design in a project.

ii. Microsoft Project software is a useful tool in the project management discipline over the traditional hand drawn bar charts.

iii. A few types of quality management systems are evolved in construction projects.

Question 4

Risk is defined as 'uncertainty of outcome'. In any project it is important to make sure that a risk management process is adopted.

a) Explain the risk management process.

b) Describe and explain the 4Ts in risk management process.

c) Illustrate a common tool available for a PM to use in support of the risk management process.

Question 5

Any activity has a life cycle and projects are not an exception. Define the stages of a project lifecycle and explain the difference of each stage. You may use tables, graphs, statements to support your answer.

Question 6

Project Management is aimed to achieve project goals in a successful manner. This is critical in successful delivery of large scale, complex construction projects where historical evidence is showing failures in achieving project goals, irrespective of the projects may ultimately reach physical completion.

a) Discuss what is inferred as "Project Goals and Project Success"

b) Evaluate above statement critically citing appropriate examples from projects you may be aware of, either from your personal experience, or of the historic context.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91609087
  • Price:- $90

Guranteed 48 Hours Delivery, In Price:- $90

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As