Question 1

The reinforced concrete ‘slab on ground' flooring system for the 2 storey dwelling detailed in the plans is to be constructed utilising expanded polystyrene void formers. The site will be excavated to provide a level ‘bench' incorporating cut and fill. Piers will be required to support the slab on an even foundation.

a) Prepare a sketch of the plan view of the slab indicating the possible location of the piers. You can assume the piers are 300mm in diameter.(Hint: position piers at all corners/beams intersections, then place between these at maximum 1800 centres)

b) Provide a section in parts (‘break' the sketch to show relevant parts of the slab) through the slab from front to back and through the garage, detailing the use of the void formers and the reinforcement. Indicate the foundation and any change in floor level.

c) Prepare a typical section through the edge beam of the slab. Clearly show the external wall detail to 300mm above the slab.

All the sketches are to be fully labelled and notated. Relevant dimensions should be provided. In general, an A4 page will be appropriate for each sketch. Provide a border and a title to each of your drawings.

Question 2

Prepare a sketch of the joint between the external wall frames and the first floor joists. Fully label the sketch and provide dimensions and member sizes. Clearly show the fitout of the building on this sketch including:
- Ceiling and wall linings
- Full external wall detail
- Flooring
- Skirting boards etc

Question 3

Prepare a sketch detailing the head flashing over a window in the external wall. Clearly label all components and provide sizes of elements where appropriate.

Question 4

Sketch a full detail of the waterproofing to the shower in the ensuite. A full detail will show all parts of the waterproofing, including wall, floor, floor waste and hob. Include two options for the construction of the shower base:

1. Detail a hob constructed with a brick on edge clearly locating the position of the shower screen on the hob.

2. No hob with the floor level continuous from the bathroom into the shower.
Also provide a sketch detailing the waterproofing at the doorway to prevent moisture escaping to adjoining rooms.

Alternative details for the construction of the cottage

Question 5

The foundation on the site of Project 1, following a geotechnical report, is found to be moderately reactive clay.

The clay extends from below the topsoil on the site to a depth of approximately 750mm. By providing a sketch, propose an alternative footing system for the construction of the cottage. Fully detail the footing specifying concrete and reinforcement. Provide all relevant dimensions.

Should the clay, after excavation commences, prove to be at a greater depth, say an average of 1500mm below the cleared site, propose another footing system and fully sketch the detail.

Question 6

Provide a full detail of two floor systems necessary for the following footing systems:

Floor system 1 - a platform floor incorporating bearers and joists with particle board flooring and including a suitable insulation system.

Floor system 2 - a concrete floor system to replicate the qualities of the slab on ground and suitable for the new footing systems. Australian Standard 2870 - Residential Slabs and Footings may be useful if you need to research this detail.

Question 7

Sketch a section through the roof of the cottage with conventional timber framing in lieu of prefabricated trusses. Fully notate the sketch with details and dimensions of the materials proposed. (You need not design member sizes, but you should provide ‘indicative' sizes for each of the roof framing members.) Your detail will need to include a number of sketches with a plan view (showing the roofing member layout) and one section as a minimum.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92481525
  • Price:- $110

Guranteed 48 Hours Delivery, In Price:- $110

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As