Question 1. The soil profile of a site consists of 18m of sand (γ=18kN/m3, E'0=70MPa) underlain by incompressible bedrock. Figure 1a shows the plan view of a proposed new building (solid line) with an adjacent car park (dashed line). The new building and car park will be founded at a depth of 2m, following excavation of the sand. The building will exert 150kPa on the remainder of the soil profile, but the car park will exert no load.

a) Use the Newmark chart of Figure 1b to estimate the change in vertical stress in the sand below points A and B of the building and car park. As this will vary with depth, consider that the sand is split in three different layers as shown in Figure 1a, and estimate the change in vertical stress at the middle of the layers you need to consider.

b) Estimate the final settlement below points A and B of the building and car park. In your calculations you should account for the decrease in vertical stress that excavation will cause. Also, you should consider the loads to apply on the surface of the FINAL soil profile, after excavation has taken place. You should use as many copies of Figure 1b as you need and hand them in as part of your answer.

1404_Soils assignment1.png

Figure 1a: Plan view of proposed new building and car park (left) and proposed subdivision of the site's soil profile (right).

1613_Soils assignment2.png

Figure 1b: Newmark chart with 200 elements.

Question 2. Figure 2 shows a cross-section of a dam founded on clay (k = 10-8 m/sec) underlain by impermeable bedrock. The depth of the reservoir behind the dam is 35m, while the depth of the river in front of the dam is 7m. As shown in Figure 2, a vertical, impermeable grout curtain has been constructed under the toe of the dam.

Assuming that the water level in the reservoir and the river is constant, use a carefully sketchedflownet to estimate the amount of water lost from the reservoir due to seepage, permetre length of the dam. Sketch your flownet on Figure 2 and hand it in as part of your answer. Assume γw = 10kN/m3.

Question 3 A rectangular footing 2m x 5m is to be founded at 3m depth, in a very thick layer of soil. Calculate the maximum vertical force that the footing can carry in each of the following cases.

a) The soil is sand with friction angle 280 and unit weight 18kN/m3. Groundwater level is well below the foundation level and the sand can be considered dry.

b) The soil is clay with uniform undrained shear strength of 70kPa and unit weight 20kN/m3.

1459_Soils assignment3.png

Figure 2: Cross-section through a dam.

 

 

 

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91519365
  • Price:- $45

Priced at Now at $45, Verified Solution

Have any Question?


Related Questions in Civil Engineering

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As