Ask Civil Engineering Expert

Question 1 (refer to Project 3)

Develop a plan to demolish the existing dwelling shown on the site plan in accordance with the legislative and planning requirements and at all times utilising safe work practices. The dwelling will have been constructed from some building materials containing bonded asbestos.

In your plan, list the relevant Acts, Australian Standards and Codes with which the processes will need to comply.

Note: This is not a sketch, but a set of steps outlining your approach. You might include a sketch to indicate specific requirements of the demolition process.

Question 2 (refer to Project 3)

From the project documentation, identify the loads the building will be subjected to during its life. Prepare a simple sketch of a section passing through the centre of the dwelling and showing the structural elements of the building.

Draw arrows on the section to show the direction the load path will take to transfer the loads to the foundation of the building. Your illustration(s) should deal with wind loads as well as dead and live loads.

Question 3 (refer to Project 1)

Research and list the Building Code of Australia requirements for the dwelling to be built within the following zones:
- Bushfire (medium risk)
- High wind
- Earthquake
- Alpine area (NSW)

Question 4 (refer to Project 1)

A site inspection is necessary prior to tendering or commencing construction on a project to assess the natural and developed features of the site which will contribute to the cost and/or planning of the construction.

Consider the site of the dwelling is vacant and you are intending to tender on the construction of the building. Create a checklist for a preliminary site inspection of the site which could be used on future projects. The checklist should be word processed and incorporate tables where suitable.
Provide a sketch of the site clearly showing salient features such as:
- vegetation
- rock features
- existing services
- improvements such as fences and existing buildings
- orientation
- contours

Question 5 (refer to Project 1)
Prepare a list and description of all the relevant services required or likely to be installed in and around the building and note any special provisions needed. For each service, list the Australian Standard or Code with which the service must comply.

Question 6 (refer to Project 1)
Prepare a checklist to ensure the quality of each of the following systems to the building:
- footing
- floor
- walls
- roo

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92328302
  • Price:- $45

Guranteed 36 Hours Delivery, In Price:- $45

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As