Question 1.

A pipe is laid along one proposed footing (1st) boundary with a depth of 5m. A uniform loading (100kPa) is given by 1st footing. 2nd proposed footing is near to the 1st footing with a distance of 2m. 2nd footing give a uniform loading, 80kPa. Calculate vertical stress increment (Δσv) due to these two footings for A, B C, D and E on the pipe.

494_Estimate the undrained shear strength of clay.png

Question 2.

H1 = 2.5m, e = 0.5, Gs = 2.65

H2 = 2 m, e = 0.65, Gs = 2.68

H3 = 3m, e = 0.81, Gs = 2.71

Plot variation with depth from the top to Point C for σ'v and σh when the soil is at rest.

476_Estimate the undrained shear strength of clay1.png

Question 3.

A pipe line project uses the natural stability of soil (short-term). A strip area was excavated. After the completion of the project, soil backfill will be applied. To design the slope, a saturated sample of clay is found to have a water content (w) of 60 %. Atterberg Limits were wL = 80 and wP = 30.

1. Estimate the undrained shear strength (cu) of clay. (Assume the shear strengths to be 200 kPa and 2 kPa at Liquidity Index (IL) values of 0 and 1, respectively).

2. If β = 60°, is the slope safe?

3. Based on your judgement, what is the appropriate factor of safety for this slope?

4. What should be the value of β, in order to achieve your appropriate factor of safety?

1040_Estimate the undrained shear strength of clay2.png

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9743900
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As