Ask Mechanical Engineering Expert

QUESTION 1- System is 100 L/s, pipe diameters of 100 and 200 mm, and pipe lengths of 50 and 100 in. Pipe roughness ics = 0.06 mm. Assume kinematic viscosity v = 10-6 m2/s.

Sketch the hydraulic and energy grade lines showing relative magnitudes and slopes.

1026_Sketch the hydraulic.png

QUESTION 2- A reservoir (water surface elevation of 100 m) feeds two lower reservoirs LI and L2. Water surface level in the LI reservoir is 70 m and in the L2 reservoir is 60 in. The reservoirs are connected through the network of pipes as shown below. Calculate the flows in each pipe.

 

Length

Diameter

A

Special features

Pipe 1

20000 m

0.5 in

0.05

No minor losses

Pipe 2

5000 in

0.4 m

0.05

No minor losses

Pipe 3

5000 m

0.3 m

0.05

No minor losses

1801_water surface elevation.png

QUESTION 3- rises 2 m. 1 ne tnetton tactor r = dins. Estunate me power required to drive me selected pump if its efficiency is 85%. For applied speed n = 1450 rpm, what type of pump do you suggest?

QUESTION 4- Topographical survey for a hydropower project shows that the available head is 100m. Design discharge for the river was 150 m3/s. What would be the installed capacity (power in MW) of the power plant? What type of turbine should be used if the turbine speed is 600 rpm?

QUESTION 5- Water at 20° C flows from the basement to the second floor through the 25 mm diameter metal pipe at a rate of Q = 1.0 Us and exits through a tap of diameter 12 mm as shown below. ks=1.5 x 104 mm. Determine the pressure at point (1) if

a. viscous effects are neglected;
b. only major losses are included;
c. all losses are included

2304_Determine the pressure at point.png

QUESTION 6- A wide rectangular channel has a change of slope from 1 in 100 to 1 in 500 and the flow is 4m3/s/m. Manning's n can be taken as 0.015.

a. Determine the normal depth of flow before and after the change in gradient.
b. Will it be possible to produce a hydraulic jump in the channel downstream of the junction of two slopes?
c. Calculate the height of the jump and sketch the surface profiles before and after jump.
d. Calculate energy loss and approximate dimension of the jump.

QUESTION 7- Determine the headwater depth of a 1000 mm (high) by 1500mm (wide) concrete box culvert operating under outlet control with a stream flow of 3.0 m3/s. The culvert is 50 m long. K.=0.5 and on a slope of 0.25%. The tailwater depth is 1.1w. What will be the headwater depth if the tail water depth is reduced by 0.8 m?

QUESTION 8- An earthen channel (n=0.03) has a bed width of 5.0 m, a water depth h = 1.5 in, a 45° side slope, and a channel slope of 0.001. Calculate the average velocity in the channel and the discharge. Determine whether erosion will take place if the maximum pennissible flow of water in an earthen channel is 1.5 m/s.

QUESTION 9- The annual precipitation in mm observed on a network of stations is shown below. Compute the average area rainfall by

a) the arithmetic average method and

b) Thiessen polygon method. Red dots show the rainfall stations and the text shows the rainfall amount in mm for the corresponding station. Blue line shows the river network within the catchment.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M91523326
  • Price:- $70

Priced at Now at $70, Verified Solution

Have any Question?


Related Questions in Mechanical Engineering

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Force exerted by jet on moving cart1 you need to determine

Force Exerted By Jet On Moving cart. 1. You need to determine the velocity of water that comes out from the nozzle of this system. need the equation please formulate the equation. 2. This water will strike a small cart a ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Materials behaviour from atoms to bridges assignment -

Materials Behaviour from Atoms to Bridges Assignment - Distributed loads and static equilibrium (Please note: you should show your steps with necessary figures) Q1. Two beam sections are jointed at C and supported at A b ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As