Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Question 1 - Creating a LabVIEW virtual instrument (VI) Create a VI for the RLC series circuit shown below that will calculate the following values:

(a) Capacitance reactance

(b) Inductive reactance

(c) Impedance

(d) Phase angle

When you have completed each exercise save the LabVIEW VI as file name RLC Circuit.vi and submit it to AUTonline.

RLC Series Circuit

The inputs for the VI are:

(i) AC supply voltage is 10 V with a frequency of 50 Hz.

(ii) Resistance value is 10 k? (or 10 × 103 ?)

(iii) Capacitance value is 100 µF (or 100 × 10-6 F)

(iv) Inductance value is 10 mH or (10 × 10-3 H)

The outputs for the VI are:

(i) Capacitance reactance (XC) in ohms (?).

(ii) Inductive reactance (XL) in ohms (?).

(iii) Impedance (Z) in ohms (?).

(iv) Phase angle (∅) in both degrees and radians

(v) Circuit current (I) in Amperes (A).Question 2 - Fault finding a LabVIEW virtual instrument (VI)

Download the file Q2.vi from AUTonline and correct any faults that exist in the code on the block diagram. Once satisfied that the VI is working correctly submit the answer with the file name

Q2 Answer.vi to AUTonline using the drop in box for this question.

Use the circuit and formula below to answer.

List below the faults found in the VI

Question 3 - Creating a subVI within a LabVIEW virtual instrument (VI)

Download the file Q3.vi for this question from AUTonline.

Examine the block and determine which part of the code is repeated several times. Use a subVI to replace this code and change the icon view of the subVI so it has the words SUB VI in plain text on a white background with a black border.

Save the new main VI as Q3 Answer.vi and the subVI as Sub VI.vi it and submit both files to AUTonline.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91609093

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As