Ask Civil Engineering Expert

Q1.

1444_Figure.jpg

Fig. 1

In this question, you will make some centrality calculations.

i. Consider Figure 1. For all the nodes in the Figure except the peripheral (leaf) nodes, calculate the betweenness centrality of the node by hand. Show all workings.

ii. Now, assume that Node 4 is in a fully percolated state (one) and all other nodes are fully unpercolated (zero). Write down the list of nodes which will have a non-zero value for Percolation Centrality, and compute the Percolation Centrality for each of these nodes.

iii. Now, assume that the percolation states change, so that only Node 2 is in a fully percolated state (one) and all other nodes are fully unpercolated (zero). Again, write down the list of nodes which will have a non-zero value for Percolation Centrality, and compute the Percolation Centrality for each of these nodes.

iv. Provide an intuitive comparison or explanation which justifies your results comparatively between parts ii and iii.

Q.2

Pagerank algorithm can be used as an effective centrality measure particularly for directed networks.

2003_Figure1.jpg

Fig.2

i. Now let us compute some ‘pagerank' values for this network. Assume alpha = 0.8, and all nodes have a value of (1/N) to begin with, where N is the size of the network. Prepare an Excel spreadsheet, which dynamically updates the pagerank value of each node based on the values of relevant nodes in the previous timestep. Based on your spreadsheet, prepare a sorted list of pagerank values for all nodes after 100 iterations.

ii. Verify that the pagerank values still add up to 1.

iii. How does the pagerank of Node 6 and Node 9 compare? Do you think this makes sense? Please explain how.

iv. If all the edges are now considered bidirectional (except the ones between Node 6 and Node 7, which together already make a bidirectional edge), how would it affect the relative rank of Node 6? Predict and justify your answer without re-computing the pagerank values of the whole network.

Q.3

Consider an Iterated Stag Hunt (ISH) played in a networked system. The networked system on which the game is played is given by Fig.1. The pay-off metric for stag-hunt is given by Fig. 4. The nodes at each iteration play a round of SH with each of their nearest neighbours. Thus, M games are played per iteration, where M is the number of edges. The nodes use the simple strategies of coordination C or defection D. Your overall objective is to maximise the system utility (total payoff for the system).

759_Figure2.jpg

Fig. 4

i. What is the pay-off for the system from a D-C link, a C-C link, and a D-D link, respectively? Consequently, which types of links do you need to maximise to increase system pay-off? Which are the second-best type of links?

ii. If there is a constraint that the number of players playing C must equal the number of players playing D, come up with a scheme which ensures highest public utility per iteration. In your answer, denote what pure strategy each node must play, and the corresponding total pay-off per iteration.

iii. Now assume that each node plays tit-for-tat in an iterated game, and the pure strategies that you have assigned are simply the initial pure strategies for iteration one. Will the system pay-off change in the second iteration? By how much? Justify the answer.

iv. If all nodes play tit-for-tat, what is the average system pay-off per iteration according to your initial configuration?

v. Could you have increased this average system pay-off per iteration by beginning with a different initial configuration, given that initially you still you need to assign equal number of C and D nodes? Justify your answer.

Q.4

Consider Fig.1 again. In this question. You will calculate the robustness coefficient R of this network, by using different centrality measures.

i. Rank the nodes according to degree, and compute R based on degree according to this ranking.

ii. Now, re-compute R again by using ‘dynamic degree'. That is, rather than using the degree of each node which is pre-computed at the start, use the ‘new degree' which is obtained after node removals which might be different from the original degree, to rank nodes at each step. Does this make any difference in the value of R?

iii. Now compute the R value of this network, based on betweenness centrality. Use the values computed in Q.1 for this purpose. You can use ‘static' betweenness values (that is, you need not recompute betweenness after each step).

iv. Compute R value of the network given in Fig.2 , based on pagerank centrality. Use the values obtained after 100 iterations. Again, you need not recompute after each node removal.

v. Comparing Fig. 1 and Fig. 2, based on the R values you obtained, which network seems more robust? Do you think this is a fair comparison? Justify your answer.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92314406
  • Price:- $120

Guranteed 48 Hours Delivery, In Price:- $120

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As