Q. Necessity of air valves in pressurized pipelines?

Air valves are broadly categorized into two major types: single air valves and double air valves. Single air valve comprises a small orifice air valve that allows automatic release of a small quantity of accumulated air at the time of normal operation of the pressurized pipeline. Double air valves comprises a small orifice air valve and a large orifice air valve. Large orifice air valve exhausts air automatically during filling and permits admission of air at the time of emptying of the pipeline. Though it can't perform the function of a small orifice air valves. 

Presence of air in the pressurized pipeline is undesirable because of the below reasons:

(i)  Presence of air causes significant impedance to water flow andin the worst case it may even cause complete blockage of system.

(ii) The air persuadessignificant head loss to the system and causes wastage of useful energy.

(iii)It may cause serious damage to meters and even cause inaccurate reading of the meters.

(iv)The presence of air causes water hammer damage to pipeline.

The absence of air (which is during emptying operation of pipeline in routine maintenance) can also produce problems because of the following:

(i)  Suction generated draws in dirt and mud via faulty connections and cracks in pipelines.

(ii) The seals, gaskets and internal accessories would be suctioned inside the pipelines.

(iii)Sometimes, suction forces may be so significant to cause collapse of pipelines.

One may query that if a large orifice air valves can carry out the functions of filling and release of air, why is it essential to add small orifice air valves in pipeline system for release of accumulated air during normal operation? The reason is that air accumulated at the high points of pressurized system would be expelled through the large orifice air valves (in case no small orifice air valves are installed in the system) upon starting of a pump and with this kind of rapid outflow of air through the large valves, high slam pressure can be produced resulting in the damage of pipelines.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9576303

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As