PURPOSE OF ASSIGNMENT

The purpose of this assignment is to:

- ULO1: Articulate a thorough understanding of the basic principles and practices of measurement and estimating.

- ULO2: Demonstrate the use of the Australian Standard Method of Measurement (ASMM) as a tool for completing measurement and estimating work.

- ULO3: Measure quantities and estimate unit rates to prepare tenders for common types of low and medium rise construction.

ASSIGNMENT TASK

Overview of the assignment task

This assignment consists of two elements in which you are required to carry out work leading up to and including the preparation and pricing of Bills of Quantities (BOQ).

The element 1 requires you to produce a number of sections of the final draft BOQ for the proposed New Apartment Development (Job no: 12-171) shown on the attached structural and architectural drawings. With regards to the BOQ, you are required to produce the measured work sections of the document. You are not required to produce a full preliminaries section.

In element 2, you are required to estimate unit rates for, and to price the items within the work sections of the BOQ you prepared in element 1.

Further requirements for element 1 and element 2 are given below:

Element 1: Measurement, billing & BOQ finalization task and individual report
Element 1 - Part 1
For "element 1 - part 1", your group is required to produce the measured work sections of the BOQ for the following work of the proposed new apartment development:

I. Preliminaries (Include a total of ten (10) preliminaries items - Include an item for Description of the Works, and nine (9) other items that would normally need to be priced by the contractor's estimator)

II. Groundworks (excluding groundworks for bored piers)

III. In-situ concrete work (up to the bottom of level 2 floor slab [first floor slab]
only, excluding bored piers and stair cases)

IV. Formwork for in-situ concrete (up to the bottom of level 2 floor slab [first floor slab] only, excluding bored piers and stair cases)
Your Take-off and BOQ must be prepared in accordance with the requirements of the

Australian Standard Method of Measurement (ASMM) 6th edition.
The BOQ task MUST be completed using a suitable software such as MS Excel while take-off MUST be carried out manually as a hand-written document.

Essentially there are three sub-stages for you to carry out in connection with the BOQ preparation:

1. The taking off of the quantities - This is, the measurement of the construction work - setting down of descriptions and their related dimensions. A manual take-off (hand-written) on the appropriate paper is required for this task.

2. The preparation of a first draft BOQ - It is likely you will possibly (not always) take-off the work by sub groups. For example, the substructure group will include some excavation and some concrete. Preparing the first draft involves the reordering of the take-off into the ASMM sections listed under (i) to (iv) above.

3. The preparation of the final draft BOQ - This is where the information set down on the manual take-off is transferred into a professional document (BOQ). The final BOQ must be completed (as noted previously) using a suitable software such as MS Excel.
Ensure that you show all waste calculations within the take-offs, and if needed, annotate the take-offs with side notes and mark-up the drawings to show that you have measured all items required.

Make sensible assumptions in relation to the measurements where any information is missing, specification is inadequate or exact nature of construction is not clear. Any assumptions made shall be entered on to a Query Sheet for the attention of the Architect.
Note that around and within these tasks will be the supplementary activity such as checking and amending your work at each stage. Checking is a must NOT a maybe. This is the quality assurance component for your BOQ that is required for a professional workplace standard. Your submission should clearly demonstrate that you have undertaken the various procedures and associated checking.
Remember to check, check and double check.

Ensure that you employ all standard techniques and follow all conventions for setting out construction measurement information in preparing the take-off and BOQ.

You are required to organize your group in such a way that all six group members are involved in element 1, so that each group member has an involvement and understands all aspects of the work.

Element 1 - Part 2
"Element 1 - part 2" involves each student submitting an individual report which is a concise discussion/reflection about how the group went about completing this assignment - how the work was distributed, who did what, what contribution everyone made, how the team collaborated and communicated, what you learned from the assignment, what difficulties encountered and how they were resolved etc.

Element 2 - Pricing bills of quantities

Element 2 - Part 1
For "element 2 - part 1", it is important to appreciate that your role has now changed. In the first element of the assignment your group was operating in the manner of a cost consultant or quantity surveyor representing the client. Your task, simply stated was to prepare a tender document (BOQ), which would be sent to several contractors. These contractors would then use the BOQ to prepare their bid in competition with other contractors to win the project.

Your task now is to operate in the same manner as a team of estimators working for one of the tendering contractors.

You are required to calculate unit rates for the items within the following work sections, which appear in your BOQ for the proposed

New Apartment Development:
I. Preliminaries (Include a total of ten (10) preliminaries items - Include an item for Description of the Works, and nine (9) other items that would normally need to be priced by the contractor's estimator)
II. Groundworks (excluding groundworks for bored piers)
III. In-situ concrete work (up to the bottom of level 2 floor slab [first floor slab]
only, excluding bored piers and stair cases)

IV. Formwork for in-situ concrete (up to the bottom of level 2 floor slab [first floor slab] only, excluding bored piers and stair cases)
There must be the build-ups for each unit rate - that is, the back up to the calculations. Note, the task is to calculate the unit rates not look up the rates in Rawlinson's or some other reference book, you may however use Rawlinsons to cross check your rate build-ups.

When you have calculated the unit rates you should enter them into your final BOQ at the appropriate position and extend the figures to determine the cost for each of the work sections and a total cost for the works (exclude profit, contingencies or any mark-up).

All unit rate build-up calculations produced must be printed and attached to your final assignment. The calculations can be printed using the ‘print screen' function, and is acceptable for this assignment.

As noted in element 1 of the assignment that around and within these tasks will be the supplementary activity such as checking and amending your work at each stage. Checking is a must NOT a maybe. This is the quality assurance component for your work that is required for a professional workplace standard. Your submission should clearly demonstrate that you have undertaken the various procedures and associated checking.

Remember check, check and double check.

You are required to organize your group in such a way that all six group members are involved in element 2, so that each group member has an involvement and understands all aspects of the work.

Element 2 - Part 2
"Element 2 - part 2" involves each student submitting an individual report which is a concise discussion/reflection about how the group went about completing this assignment - how the work was distributed, who did what, what contribution everyone made, how the team collaborated and communicated, what you learned from the assignment, what difficulties encountered and how they were resolved etc.

FORMAT OF ASSIGNMENT

Element 1
- Element 1 must be submitted as a single A4 pdf document, that has been "stitched" together, which will include your take-off, formal non-priced BOQ, marked up drawings, query sheet and individual report. However, you need to separately identify part 1 and part 2 within the report.
o Part 1 includes: take-offs, query sheet, marked-up drawings, formal non- priced BOQ;
o Part 2 includes: individual report.
- Prepare all your work in a neat, tidy and professional manner.

Element 2
- Element 2 must be submitted as a single A4 pdf document, that has been "stitched" together, which will include your priced BOQ, rate build ups (calculations) and individual report. However, you need to separately identify part 1 and part 2 within the report.
o Part 1 includes: rate build-up calculations and the priced BOQ;
o Part 2: individual report.
- Prepare all your work in a neat, tidy and professional manner.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92446639
  • Price:- $175

Guranteed 48 Hours Delivery, In Price:- $175

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As