Ask Civil Engineering Expert

Project Spring

EACH student is required to complete a course project. The objective of the project is to investigate long term changes (at least several- month long) in stream flow patterns due to precipitation in a particular watershed. Each student will analyze a different watershed for which stream flow data and precipitation data are available for the specific period, and present results in a written paper. Watersheds and time periods of analysis should be selected to answer a question about changes in stream flows in response to changes in crop production practices or urbanization or IDF curve development. The paper will include

1. An abstract (overview of your work and conclusion)

2. An introduction (that will provide a statement of objective and justification for the watershed and time period selected)

3. Descriptive information on the watershed (size, location, land cover) and data sources

4. Hydrological analysis of this watershed (real precipitation and flow data for the specific watershed must be presented, and this part must include detailed calculation between precipitation and runoff flow).

5. Results, discussion of results, including discussion of scientific articles that provide relevant explanation for any of the patterns observed.

6. References (including all citations you used in your report)

The paper should be about 12 pages (Time new roman, 12) in length.

Standards:

1. The project will account for 20% of your overall grade. The written report will be double-spaced. The first part should concisely describe the nature of the problem that will be addressed.

2. Components of Project

a. Well-organized structure
b. Abstract
c. Introduction

i. Statement of objective
ii. Justification of the watershed you selected
iii. Literature review of hydrologic analysis of the watershed
iv. Quality of writing

d. Descriptive information on the watershed (size, location, land cover, show a decent geographical map, and data sources.

e. Hydrological analysis of this watershed

i. Real precipitation and flow data in a table for the specific watershed
ii. Detailed calculation of precipitation, runoff flow and other hydrological processes (e.g., IDF curve development).

f. Results and Conclusions

i. Results analysis of your calculation including some figures such as hydrograph hyetograph, IDF curves (for design concerns) etc.
ii. Show your conclusion based on your analysis

g. References.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92311030
  • Price:- $120

Priced at Now at $120, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As