Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Project Introduction - Hiram's Highway Improvement between Clear Water Bay Road and Marina Cove, Sai Kung

To improve two sections of Hiram's Highway between Clear Water Bay Road and Pak Wai, the existing Ho Chung Road and Luk Mei Tsuen Road.

The proposed improvement works will relieve the traffic congestion on the road section near Marina Cove, enhance the safety of the road section and improve the local access to Ho Chung and Luk Mei Tsuen.

Task

You are required to undertake an independent study and report in essay form on how the whole project and project delivery system are defined.

You have to evaluate your understanding of the following topics by applying theories/principles/concepts to the construction management of the project:-

Project Definition

(1) The circumstances that led to the project;

(2) The goal of the project and the products and/ or services needed for the achievement of goal;

(3) The Project Stakeholders, together with the interests of each Stakeholder;

(4) The needs and advantages of the planned development project;

(5) The most important projects performance objectives - Time? Quality? Cost? Others?;

(6) The resources needed for the project;

(7) The major project constraints and risks.

Project Delivery System and Contract

(8) The type of project delivery system used and the reason for this;

(9) The relationship among the major project stakeholders;

(10)The project development process and the involvement of parties in major phrases of the process;

(11) The type of contract used and the reason for this;

(12) The type of tendering process used and the reason for this.

Heuristics and Biases

(13) The concepts and practical applications of cognitive bias;

(14) The general heuristics that are employed in making decisions in any process throughout various project phrases.

Cognitive Behaviour

(15) The concept of cognitive behaviour as an important human-related factor and the influences on the interpersonal relationship.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92740442
  • Price:- $80

Priced at Now at $80, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As