Ask Civil Engineering Expert

PROJECT DESCRIPTION

The project in the course is a comprehensive course-level assessment on various aspects of cost estimation.

In the project, you are required to prepare construction estimates for an office, collate the estimates in a Microsoft PowerPoint presentation, briefly justify them, and also justify the choice of the spreadsheet style for each estimate.

Course Objectives Tested:

1. Demonstrate a systematic approach to completing the estimating process in commercial construction.

2. Demonstrate basic skills required to measure and calculate quantities.

3. Describe the methods used for pricing the various takeoff elements in a construction project estimate.

4. Prepare a takeoff of concrete work for a construction project.

5. Prepare a takeoff of masonry work for a construction project.

6. Prepare a takeoff for a construction project using metal components.

7. Estimate the quantity of woods and plastics.

8. Estimate the pricing for thermal and moisture protection for a project.

9. Estimate the doors and windows, finish materials, and equipment needed for a construction project.

10. Prepare an estimate using fire suppression, plumbing, mechanical and electrical factors and Means CostWorks data sets.

11. Prepare an estimate using earthwork factors and Means CostWorks data sets.

12. Prepare a price estimate for construction equipment and excavation work.

13. Apply assembly and approximate estimating techniques.

14. Analyze equipment and general requirements in the estimating process.

15. Prepare a price estimate of concrete, masonry, structural steel, carpentry, and miscellaneous items.

Title: Building Construction Proposal

Assume that you are part of a construction company and you have to prepare cost estimates for the construction of a branch office of a software development company, which has an expected occupancy of 100 people.

Perform the following tasks:

Task 1:

Prepare cost estimates for components such as excavation, masonry, concrete, interior finishes, plumbing, electrical, and heating, ventilation, and air-conditioning (HVAC).

You may choose Excel, CostWorks, or both to prepare the estimates. Justify your choice of spreadsheet style for each estimate in a separate Word document.

Task 2:

Collate the estimates in a PowerPoint presentation. Briefly describe each estimate in the Notes area of the respective slide.

Submission Requirements:

Submit the following:

1. Cost estimates in Excel or CostWorks format

2. Justification of the spreadsheet type in a Word document (font: Arial, size 12, double-spacing; citation style: APA; length: 2-3 pages)

3. Descriptions of the estimates in a PowerPoint presentation.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91756045
  • Price:- $60

Priced at Now at $60, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As