Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Project: Construction of Carbon Revolution Building 2

1. BACKGROUND

Introduction

You are members of the Capital Projects Team of Facility Services Department at Deakin University who are assigned to undertake work encompassing a high level estimate of building cost of the Structural Works for the Carbon Revolution Building 2, located in the Waurn Ponds campus of Deakin University. 

2. THE DESIGN BRIEF & SCOPE

The work for this project is to be advertised for tender in the near future. To date, some of the design drawings have been completed. For this stage, a high level cost estimate is required for the owner estimate of the cost of the project. The following scope of work has been assigned for the high level project cost estimate. 

-  The site location is as indicated (Appendix A)

-  The design drawings are provided (Appendix B) 

-  Additional drawings may be released during the design progress

-  The cost estimate is only for foundation and structure of the building

-  The Bill of Quantities is to be completed (Appendix C)

-  The cost of work is to be estimated based on published construction rates (e.g.

Rawlinsons Construction Handbook, Cordell Building Cost Guide, Aust. Institute of Quantity Surveyors, etc.)

-  Any assumptions, notes or disclaimers regarding your cost estimate should be documented in your Assessment 1 report submission and in your Journal Diary

You may insert additional rows under 'D. MISCELLANEOUS' section for other costs you can identify from the drawings, as well as providing some brief details on each of these additional items. 

3. CONDUCT OF WORK

The Deakin University rules and regulations apply to this work.

4. SITE INSPECTIONS

At this stage, site inspections are not required. Employees may use satellite image to acquaint themselves with the site where any work is to be undertaken. Refer to Appendix A.

5. EXTENT OF WORK

A. The overall works to be undertaken includes:

-  Undertaking high-level (rough) estimate of works quantity based on provided design drawings of the project 

-  Undertaking research on the unit rates (unit price) to conduct construction works for the project

-  Provision of completed Bill of Quantities with prices 

-  Clearly specifying the source of data and additional information about justification as required, conditions, inclusions or limitation of the rates

B. This Assessment should be submitted as a group report.

C. A table indicating group members' contribution to the works should be submitted with the report. 

D. Only 1 report per group is to be submitted via CloudDeakin.

E. Groups will be allocated in Week 1 Seminars or via CloudDeakin for off-campus students.

Attachment:- Assignment.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91899549

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As