Ask Civil Engineering Expert

Prepare a report on "What are Polyaspartics?"

The Report should contain the following sections:

1. Abstract
2. Introduction
3. Your material/Methodology
4. Application of materials/Execution
5. Result Discussion/Conclusions
6. References

1. Abstract

The abstract must be brief, but it has to tell the reader
1. What is the goal of the work (e.g. study the influence of w/c ratio on the workability of concrete) etc.
2. Which type of work has been carried out (e.g. lab experiments etc.)?
3. What are the results obtained (e.g. increasing the w/c ratio increase the workability of the mix), preferably not more than 2 sentences.

2. Introduction

1. Depending on the project selected give brief history and theory on that topic.
2. Discuss general material classification, factors affecting the selection process.
3. How has the work been done (using the lab test, name your tests)
4. Give the general plan of the report (e.g. how do you collect your sample and what will you do to discuss these properties).

Your material/Methodology

a. Discuss the properties of the selected material (e.g. for auditorium material used for ceiling, walls etc)
b. The tests to check the properties.
c. The results you get and analysis for those results.
d. Application of materials/Execution
e. Explain how the material will effect in terms of performance.
f. What was the procedure to perform any test?
g. Procedure for mix design etc

h. Result Discussion/Conclusions (maximum 1 page) State briefly what are the major achievements of your work?

i. References Use CU Harvard referencing system as per our college rules.

j. Appendix Any additional figures, tables, and photos should be included here.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91300820
  • Price:- $35

Priced at Now at $35, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As