Part A

Question 1

In aid of Diagram discuss the types of Earth moving used in the field of Civil Engineering

Question 2

Discuss on Hoisting and Conveying Equipment and elaborate clearly why it is very important in the field of Civil Engineering.

Question 3

Discuss on the following; cofferdams, caissons and piling and elaborate clearly on their application on the field of Civil Engineering.

Question 4

Relate the use of Pumps and Compressors into Civil Engineering works.

Question 5

List and discuss five (5) factors that influence the use of plants in large Civil Engineer in Works

Part B -

CRFG engaged by the Fiji Government to upgrade the Princes road which is a 50million Project and 3 years Contract You were recruited as Civil engineering Technician for China Railway First Group (CRFG) and you are assigned to carry out the following

1. Draw a site layout of your site office. (Location)

2. Prepare a Typical Cross Section of the road (Cut & fill)

3. Work Program (Gant Chart)

4. Bill of Quantities

Part C

Question 1

A sandy clay soil being excavated from a road cutting and re-used for fill has the following characteristics:

Bank density = 1600kg/m3

Loose Density = 1250kg/m3

Compacted Density = 2000kg/m3

Find the Load Factor (I), the shrinkage (%), and what volume 152,000Lm3 would be after compaction

Question 2

Find the swell for a soil which weighs 1600kg/m in bank and 1300kg/m3 in bank and 1300kg/m3 Loose.

Question 3

What is the shrinkage factor for a mass of soil that takes up 1.5m3 in bank and reduces down to 1.2m3 after compaction

Question 4

Calculate the Load Factor for clay if the percentage swell from the bank state is 25%.

Question 5

If a mass of soil reduces volume by 23% from the bank condition after compaction then what is the shrinkage factor

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9881562

Have any Question?


Related Questions in Civil Engineering

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As