Part-1:

A leading precast manufacturer has decided to replace a chemical admixture which has been used for more than a decade with a new chemical admixture to control early set and accelerate strength development. The advantage claimed for the new admixture is that it has excellent compatibility with air entraining admixture used in some precast products. However, the plant manager has suggested completing an experimental trial so that the benefits of the new admixture can be established before making changing to the materials used.

Task 1

Prepare an outline of the experimental design you will suggest to the plant manager. This outline should contain research rationale, aims and objectives, research methodology, nature of data analysis and interpretation, and possible outcomes/conclusions to be drawn. [The research methodology should contain details of materials to be used, tests to be carried out and experimental controls to be established so that meaningful data can be obtained. The nature of data analysis and interpretation should deliver conclusive findings to address the aims and objectives.]

Task 2

Identify learning resources that you will consult for understanding the topic of research, materials, test methods and data analysis. Prepare a list of references which can be consulted for completing this task.

Part -2:

Task #01:

- Please see "Design of Experiment Methods" presentation - 2nd slide on page 1.

- What should you be measuring? Define the dependent variable(s).

- How are you going to measure air entrainment? How are you going to measure the influence of these two admixtures on other properties of interest, e.g. setting time, early compressive strength. Research available/variety of tests to be used and decide on most appropriate one(s).

Justify your choice.

- You have to start designing the experiment you want to do. You have to decide on type of experiment. You may want to propose a simple experiment comparing mean values of the two factors where there is only one level or may decide to go for a more complicated experiment where you want to investigate different levels of the two factors.

- Plan your experiment. Decide on how many repetitions you will need. Decide on cost implications.

- Depending on the test there may be requirements on the standard deviation and further tests may be required to prove this assumption.

- List the assumptions for which the analysis is valid for, e.g., for normality, standard deviation, etc. Please see replies to recent queries.

- The test may not necessarily be a test of variance. Select most appropriate type of test.

- Note that all but parametric testing requires data to be normally distributed.

- Explain the analysis of the particular experiment chosen. At what level is one better that the other. Significance depends on the application. Discuss the level of significance.

Task #02:

Task #02 only requires listing of sources of information you used to make the above suggestions.

Task #01:

Please see "Design of Experiment Methods" presentation - Pages 14 to 15. The slides show you how to change 2k factorial design to central composite design.

Task #02:

Please see Group Assignment #02 presentation.

Task #03:

Central Composite Design - What will the equations for the regression analysis look like? Please see "Design of Experiment Methods" presentation - Pages 14 to 15.

Task #04:

Please see "Design of Experiment Methods" presentation - Pages 13 to 15

Task #05:

Explain what information you can get out of Table 5.

Task #06:

Explain what information you can get out of Table 6.

Task #07:

Either plot the equations on page 3 or otherwise try to highlight the trends in Table 4 on page 4.


Attachment:- Assignment.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9821804

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As