problem 1: Out of a long-term record of precipitation for four adjacent stations you find that records of one station (station D) are missing for the spring months, September, October, and November for the year 2011. For those three months the other three stations recorded the following total depth in mm.

778_long term precipitation.jpg

Estimate the missing precipitation if the long-term average precipitations for the three months in all four stations are:

1045_long term average precipitation.jpg

An alternative way of estimating a missing record is by weighting observations by the inverse square distance to the point of the missing record. If the distance of the station D from stations A, B, and C are 5 km, 1 km, and 10 km respectively, compute the missing records for the station D.

problem 2:

a) Average rainfall during the month of January is found to be  R  mm. A Class A pan evaporation recorded an average of [7 + (R/100)] mm/day near an irrigation reservoir. The average January inflow into the reservoir  is  (100 +  R) m3/s  and the  average  irrigation demand during the month is 170 m3/s. The water level drops by (10 times R) mm  in that month and the average surface area of the reservoir is 21,000 ha. Estimate the seepage through the banks and the dam during this month. Assume the pan coefficient of 0.7 for the month of January.

b) find out the evaporation in mm/day from the free water surface using Penman’s method.

The following data were measured on that day:

Net Radiation = (100 + R) W/m2
 
Air Temperature = 200C
Humidity = R %
Wind run = 20 km/day measured at 2 m above the surface
 
The wind function f(u) can be find outd as 73 + 0.44 u, when u is in km/day

Vapour pressures is in kPa and γ can be taken as 0.065 kPa/0C

problem 3: Show that the infiltration volume estimated using Horton’s infiltration equation between times t1 and t2 is given by;

1182_infiltration volume.jpg

Use the above concept in answering the following problem.

In a small watershed with homogeneous soil, runoff from two storms separated by an interval of 3 hours was monitored. The infiltration capacity of the soil at the beginning of the first storm was observed to be at its maximum capacity. Given the following information, determine the runoff for the first burst and the rate of infiltration recovery between the two storms.

Storm intensities:

2148_storm intensities.jpg

Infiltration capacity: fo = 14 mm/hr, fc = 4.0 mm/hr,  k = 0.6 hr-1
 
The surface runoff for the second storm was measured as Y mm at the outlet of the watershed, where Y is given by:

If your R value is between 45 and 55 (both inclusive), then Y = 15.5 mm
If your R value is between 56 and 66 (both inclusive), then Y = 16.0 mm
If your R value is between 67 and 77 (both inclusive), then Y = 16.5 mm
If your R value is between 78 and 88 (both inclusive), then Y = 17.0 mm
If your R value is between 89 and 99 (both inclusive), then Y = 17.5 mm

problem 4:

a) Rainfall intensities for every 10 min increments of a 60 min storm are given in sequence as: 102, 78, 90, 72, 56 and 45 mm/hr.

The infiltration capacity for the given soil type and cover is known to decrease at the following rate:

1249_infiltration capacity.jpg

Determine:

i) the surface runoff for every 10 min increments 
ii) the runoff volume for the storm 
iii) Φ-index for the storm. Infiltration capacity at the start of the storm may be assumed as 100 mm/hr.

Note: The area under the infiltration capacity curve may be computed using the trapezoidal rule for every 10 min increments.

b) The following data were obtained by stream gauging of a river:

2330_stream gauging.jpg

What should be the discharge when the main gauge reads 12 m and the auxiliary gauge reads [10.7 + (R/100)] m ?

problem 5: At the outlet of a catchment with area of 182.3 km2, direct runoff flood hydrograph (total runoff minus the base flow hydrographs) resulting from a 2-hr uniform rainfall excess is presented in the following table.

2099_uniform rainfall.jpg

a) find out the rainfall excess (in cm) for the above runoff hydrograph.

b) Using the value in Part (a) find out the unit hydrograph of 2-hr duration (that is for 1cm of rainfall excess in 2 hours).

c) From the 2-hr unit hydrograph in Part (b), find out the 1-hr unit hydrograph.

d) Using the 1-hr unit hydrograph of Part (c), estimate direct runoff flood hydrograph for a storm with the rainfall excess distribution of (R/100) cm and (R/50) cm during the first
and the second 1-hr time steps respectively.

e) What would be the direct runoff flood peak if the total depth of rainfall excess (i.e. 3R/100 cm) in section (d) is used in association with 2-hr unit hydrograph?

f) Compare the results for direct runoff flood peaks in sections (d) and (e) and discuss the difference.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91130

Have any Question? 


Related Questions in Civil Engineering

Ben bitdiddle is exploring finite-state machines of the

Ben Bitdiddle is exploring finite-state machines of the following form: A. Draw a state-transition diagram for the FS . Assume that you start in the state Q 0 = 0, output = 1. B. Assume that you start in the state Q 0 = ...

The networks we have used so far in this chapter have not

The networks we have used so far in this chapter have not included a bias vector. Consider the problem of designing a perceptron network (Figure P7.3) to recognize the following patterns: i. Why is a bias required to sol ...

Design an rbf network to perform the classification

Design an RBF network to perform the classification illustrated in Figure E17.1. The network should produce a positive output whenever the input vector is in the shaded region and a negative output otherwise.

The vectors in the ordered set defined below were obtained

The vectors in the ordered set defined below were obtained by measuring the weight and ear lengths of toy rabbits and bears in the Fuzzy Wuzzy Animal Factory. The target values indicate whether the respective input vecto ...

An n-bit updown counter is a sequential circuit with a

An N-bit up/down counter is a sequential circuit with a clock input and an up/down control input. Wen control is 1, the circuit counts up, modulo 2N, on each rising edge of the clock. In other words, the present-state ou ...

The drag on a 2-m-diameter satellite dish due to an 80 kmh

The drag on a 2-m-diameter satellite dish due to an 80 km/h wind is to be determined through wind tunnel testing on a geometrically similar 0.4-m-diameter model dish. a. At what air speed should the model test be perform ...

An n-bit updown counter is a sequential circuit with a

An N-bit up/down counter is a sequential circuit with a clock input and an up/down control input. Wen control is 1, the circuit counts up, modulo 2N, on each rising edge of the clock. In other words, the present-state ou ...

Question if y1 and y2 are alternate depths of a rectangular

Question: If y 1 and y 2 are alternate depths of a rectangular channel show that y c  → Criticle depth 2y 1 ²y 2 ²/(y 1 +y 2 ) = Y c 3 and hence the specific energy, E = (y 1 2 + y 1 y 2 +y 2 2 )/(y 1 + y 2 ) No of Pages ...

The pressure drop through an oil pipeline is to be modeled

The pressure drop through an oil pipeline is to be modeled by using the flow of water through an identical length of tubing. The required oil velocity in the prototype pipeline is known to be 35 cm/s. In order for the ex ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

WalMart Identification of theory and critical discussion

Drawing on the prescribed text and/or relevant academic literature, produce a paper which discusses the nature of group

Section onea in an atwood machine suppose two objects of

SECTION ONE (a) In an Atwood Machine, suppose two objects of unequal mass are hung vertically over a frictionless

Part 1you work in hr for a company that operates a factory

Part 1: You work in HR for a company that operates a factory manufacturing fiberglass. There are several hundred empl

Details on advanced accounting paperthis paper is intended

DETAILS ON ADVANCED ACCOUNTING PAPER This paper is intended for students to apply the theoretical knowledge around ac

Create a provider database and related reports and queries

Create a provider database and related reports and queries to capture contact information for potential PC component pro