problem 1: Out of a long-term record of precipitation for four adjacent stations you find that records of one station (station D) are missing for the spring months, September, October, and November for the year 2011. For those three months the other three stations recorded the following total depth in mm.

778_long term precipitation.jpg

Estimate the missing precipitation if the long-term average precipitations for the three months in all four stations are:

1045_long term average precipitation.jpg

An alternative way of estimating a missing record is by weighting observations by the inverse square distance to the point of the missing record. If the distance of the station D from stations A, B, and C are 5 km, 1 km, and 10 km respectively, compute the missing records for the station D.

problem 2:

a) Average rainfall during the month of January is found to be  R  mm. A Class A pan evaporation recorded an average of [7 + (R/100)] mm/day near an irrigation reservoir. The average January inflow into the reservoir  is  (100 +  R) m3/s  and the  average  irrigation demand during the month is 170 m3/s. The water level drops by (10 times R) mm  in that month and the average surface area of the reservoir is 21,000 ha. Estimate the seepage through the banks and the dam during this month. Assume the pan coefficient of 0.7 for the month of January.

b) find out the evaporation in mm/day from the free water surface using Penman’s method.

The following data were measured on that day:

Net Radiation = (100 + R) W/m2
 
Air Temperature = 200C
Humidity = R %
Wind run = 20 km/day measured at 2 m above the surface
 
The wind function f(u) can be find outd as 73 + 0.44 u, when u is in km/day

Vapour pressures is in kPa and γ can be taken as 0.065 kPa/0C

problem 3: Show that the infiltration volume estimated using Horton’s infiltration equation between times t1 and t2 is given by;

1182_infiltration volume.jpg

Use the above concept in answering the following problem.

In a small watershed with homogeneous soil, runoff from two storms separated by an interval of 3 hours was monitored. The infiltration capacity of the soil at the beginning of the first storm was observed to be at its maximum capacity. Given the following information, determine the runoff for the first burst and the rate of infiltration recovery between the two storms.

Storm intensities:

2148_storm intensities.jpg

Infiltration capacity: fo = 14 mm/hr, fc = 4.0 mm/hr,  k = 0.6 hr-1
 
The surface runoff for the second storm was measured as Y mm at the outlet of the watershed, where Y is given by:

If your R value is between 45 and 55 (both inclusive), then Y = 15.5 mm
If your R value is between 56 and 66 (both inclusive), then Y = 16.0 mm
If your R value is between 67 and 77 (both inclusive), then Y = 16.5 mm
If your R value is between 78 and 88 (both inclusive), then Y = 17.0 mm
If your R value is between 89 and 99 (both inclusive), then Y = 17.5 mm

problem 4:

a) Rainfall intensities for every 10 min increments of a 60 min storm are given in sequence as: 102, 78, 90, 72, 56 and 45 mm/hr.

The infiltration capacity for the given soil type and cover is known to decrease at the following rate:

1249_infiltration capacity.jpg

Determine:

i) the surface runoff for every 10 min increments 
ii) the runoff volume for the storm 
iii) Φ-index for the storm. Infiltration capacity at the start of the storm may be assumed as 100 mm/hr.

Note: The area under the infiltration capacity curve may be computed using the trapezoidal rule for every 10 min increments.

b) The following data were obtained by stream gauging of a river:

2330_stream gauging.jpg

What should be the discharge when the main gauge reads 12 m and the auxiliary gauge reads [10.7 + (R/100)] m ?

problem 5: At the outlet of a catchment with area of 182.3 km2, direct runoff flood hydrograph (total runoff minus the base flow hydrographs) resulting from a 2-hr uniform rainfall excess is presented in the following table.

2099_uniform rainfall.jpg

a) find out the rainfall excess (in cm) for the above runoff hydrograph.

b) Using the value in Part (a) find out the unit hydrograph of 2-hr duration (that is for 1cm of rainfall excess in 2 hours).

c) From the 2-hr unit hydrograph in Part (b), find out the 1-hr unit hydrograph.

d) Using the 1-hr unit hydrograph of Part (c), estimate direct runoff flood hydrograph for a storm with the rainfall excess distribution of (R/100) cm and (R/50) cm during the first
and the second 1-hr time steps respectively.

e) What would be the direct runoff flood peak if the total depth of rainfall excess (i.e. 3R/100 cm) in section (d) is used in association with 2-hr unit hydrograph?

f) Compare the results for direct runoff flood peaks in sections (d) and (e) and discuss the difference.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91130

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As